Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0009 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $262 $800 Implemented
UM0009 # 04 Y:1994 04 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,513 $1,500 Not Implemented
UM0009 # 05 Y:1994 05 1994 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $88,700 $330,000 Not Implemented
UM0009 # 06 Y:1994 06 1994 COVER OPEN TANKS $4,163 $2,440 Implemented
UM0009 # 07 Y:1994 07 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $760 $932 Not Implemented
UM0009 # 08 Y:1994 08 1994 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,325 $6,000 Not Implemented
UM0009 # 09 Y:1994 09 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $930 $196 Implemented
UM0009 # 10 Y:1994 10 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,829 $1,500 Implemented
UM0009 # 11 Y:1994 11 1994 USE RADIANT HEATER FOR SPOT HEATING $8,161 $21,400 Implemented
ME0137 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $42,534 $50,000 Not Implemented
ME0137 # 02 Y:1994 02 1994 USE OPTIMUM THICKNESS INSULATION $22,500 $4,500 Not Implemented
ME0137 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $35,300 $70,000 Not Implemented
ME0137 # 04 Y:1994 04 1994 OPTIMIZE PLANT POWER FACTOR $9,485 $9,080 Not Implemented
ME0137 # 05 Y:1994 05 1994 METER WASTE WATER $18,700 $1,350 Not Implemented
ME0137 # 06 Y:1994 06 1994 REDUCE FLUID FLOW RATES $1,088 $1,010 Not Implemented
ME0137 # 07 Y:1994 07 1994 RECOVER WASTE HEAT FROM EQUIPMENT $6,915 $30,000 Not Implemented
UD0435 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $7,057 $10,000 Implemented
UD0435 # 02 Y:1994 02 1994 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,501 $0 Implemented
UD0435 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $3,090 $5,000 Not Implemented
UD0435 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,265 $6,838 Not Implemented
UD0435 # 05 Y:1994 05 1994 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $28,851 $50,000 Not Implemented
OR0209 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $732 $750 Not Implemented
OR0209 # 02 Y:1994 02 1994 IMPROVE COMBUSTION CONTROL CAPABILITY $27,860 $12,000 Implemented
OR0209 # 03 Y:1994 03 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $274 $0 Implemented
OR0209 # 04 Y:1994 04 1994 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,640 $2,670 Implemented