IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,620

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0048 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,576 $1,603 Not Implemented
UD0048 # 02 Y:1982 02 1982 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $4,904 $2,500 Not Implemented
UD0048 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $815 $600 Not Implemented
UD0048 # 04 Y:1982 04 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,992 $1,000 Not Implemented
UD0051 # 01 Y:1982 01 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $460 $0 Implemented
UD0051 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,295 $753 Implemented
UD0051 # 03 Y:1982 03 1982 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $4,219 $6,160 Implemented
UD0051 # 04 Y:1982 04 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,504 $900 Implemented
UD0051 # 05 Y:1982 05 1982 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,312 $1,500 Not Implemented
UD0052 # 01 Y:1982 01 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,538 $900 Not Implemented
UD0052 # 02 Y:1982 02 1982 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $182,775 $87,000 Not Implemented
UD0052 # 03 Y:1982 03 1982 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $27,811 $0 Not Implemented
UD0025 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,357 $302 Not Implemented
UD0025 # 02 Y:1982 02 1982 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,534 $6,200 Not Implemented
UD0025 # 03 Y:1982 03 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $162 $0 Implemented
UD0025 # 04 Y:1982 04 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,659 $1,000 Not Implemented
UD0025 # 05 Y:1982 05 1982 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $773 $752 Not Implemented
UD0029 # 01 Y:1982 01 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,289 $500 Not Implemented
UD0029 # 02 Y:1982 02 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $972 $0 Not Implemented
UD0029 # 03 Y:1982 03 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $7,697 $5,000 Not Implemented