Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0561 # 07 Y:2020 07 2020 USE COMPRESSOR AIR FILTERS $2,064 $5,898 Implemented
UF0561 # 08 Y:2020 08 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,057 $930 Implemented
UF0561 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,043 $0 Implemented
UF0561 # 10 Y:2020 10 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,816 $421 Implemented
UF0561 # 11 Y:2020 11 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,418 $5,192 Implemented
UF0561 # 12 Y:2020 12 2020 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $854 $800 Implemented
UF0561 # 13 Y:2020 13 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $624 $0 Implemented
AM0817 # 01 Y:2020 01 2020 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $23,040 $20,000 Not Implemented
AM0817 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $4,170 $12,500 Not Implemented
AM0817 # 03 Y:2020 03 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $19,400 $3,000 Not Implemented
AM0817 # 04 Y:2020 04 2020 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $2,950 $200 Not Implemented
AM0817 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,690 $8,520 Implemented
AM0817 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,950 $2,820 Not Implemented
AM0817 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,720 $800 Not Implemented
AM0817 # 08 Y:2020 08 2020 INSTALL OCCUPANCY SENSORS $1,210 $140 Not Implemented
AM0817 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $340 $10 Implemented
CL2101 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,572 $6,373 n/a
CL2101 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $9,334 $3,875 n/a
CL2101 # 03 Y:2021 03 2021 INSTALL TIMERS AND/OR THERMOSTATS $848 $800 n/a
CL2101 # 04 Y:2021 04 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,276 $500 n/a
CL2101 # 05 Y:2021 05 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,761 $186 n/a
OR0738 # 01 Y:2021 01 2021 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $242,489 $81,465 Not Implemented
OR0738 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $13,131 $8,725 Not Implemented
OR0738 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,831 $1,000 Not Implemented
LE0500 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $1,620 $40 Implemented