IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0065 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $200 $800 Not Implemented
UF0065 # 05 Y:1993 05 1993 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,871 $5,900 Not Implemented
UF0065 # 06 Y:1993 06 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,015 $3,000 Not Implemented
KU0398 # 01 Y:1993 01 1993 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $45,950 $48,000 Not Implemented
KU0398 # 02 Y:1993 02 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $17,158 $19,000 Not Implemented
KU0398 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,620 $2,000 Implemented
KU0398 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,875 $2,875 Implemented
KU0398 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,003 $19,646 Implemented
KU0398 # 06 Y:1993 06 1993 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,349 $700 Implemented
KU0398 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $0 Implemented
KU0398 # 08 Y:1993 08 1993 USE PHOTOCELL CONTROLS $835 $400 Not Implemented
KU0398 # 09 Y:1993 09 1993 INSTALL OCCUPANCY SENSORS $769 $1,260 Not Implemented
KU0398 # 10 Y:1993 10 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $100 $10 Implemented
ND0153 # 01 Y:1993 01 1993 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $48,899 $0 Not Implemented
ND0153 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,413 $6,235 Implemented
ND0153 # 03 Y:1993 03 1993 USE UTILITY CONTROLLED POWER MANAGEMENT $12,899 $0 Implemented
ND0153 # 04 Y:1993 04 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $12,527 $1,413 Not Implemented
ND0153 # 05 Y:1993 05 1993 OPTIMIZE PLANT POWER FACTOR $11,871 $16,760 Implemented
ND0153 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,992 $1,262 Implemented
ND0153 # 07 Y:1993 07 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $225 $218 Implemented
WI0179 # 01 Y:1993 01 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,974 $4,960 Not Implemented
WI0179 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,295 $5,659 Not Implemented
WI0179 # 03 Y:1993 03 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,270 $0 Implemented
WI0179 # 04 Y:1993 04 1993 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,354 $2,800 Not Implemented
WI0179 # 05 Y:1993 05 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $776 $500 Not Implemented