IAC logo
IAC Assessment: WI0207
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0207
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1994
Principal Product Machined components for use in diesel engine, hydraulic, and
NAICS n/a
SIC 3451 - Screw Machine Products
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 101,750
Annual Production 8,500,000 Pounds
Production Hrs. Annual 6,600
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $121,187 2,295,428 kWh $0.05
Natural Gas $14,186 2,756 MMBtu $5.15
TOTAL ENERGY COSTS $135,373
RECOMMENDED SAVINGS* $45,916 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,646
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (non-haz)
$ kWh $ MMBtu $ gal $ lb
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$10,556
Cost:
$6,000
- - $10,556 2,050 - - - - -
-
kWh
$10,556
2,050
MMBtu
-
-
gal
-
-
lb
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,229
Cost:
$3,840
$4,229 80,012 - - - - - - $4,229
80,012
kWh
-
-
MMBtu
-
-
gal
-
-
lb
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,970
Cost:
$600
- - $1,970 383 - - - - -
-
kWh
$1,970
383
MMBtu
-
-
gal
-
-
lb
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,382
Cost:
$8,346
$3,382 64,185 - - - - - - $3,382
64,185
kWh
-
-
MMBtu
-
-
gal
-
-
lb
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$325
Cost:
-
$325 6,155 - - - - - - $325
6,155
kWh
-
-
MMBtu
-
-
gal
-
-
lb
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$186
Cost:
$528
$186 3,517 - - - - - - $186
3,517
kWh
-
-
MMBtu
-
-
gal
-
-
lb
07: 2.2514 COVER OPEN TANKS Savings:
$1,852
Cost:
$288
$1,852 35,170 - - - - - - $1,852
35,170
kWh
-
-
MMBtu
-
-
gal
-
-
lb
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$708
Cost:
$820
$708 13,482 - - - - - - $708
13,482
kWh
-
-
MMBtu
-
-
gal
-
-
lb
09: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$408
Cost:
-
$408 - - - - - - - $408
-
kWh
-
-
MMBtu
-
-
gal
-
-
lb
10: 3.8143 RECYCLE CLEANING SOLVENT AND REUSE Savings:
$15,300
Cost:
$21,000
- - - - $15,300 6,300 - - -
-
kWh
-
-
MMBtu
$15,300
6,300
gal
-
-
lb
11: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$7,000
Cost:
$10,000
- - - - - - $7,000 75,000 -
-
kWh
-
-
MMBtu
-
-
gal
$7,000
75,000
lb
TOTAL RECOMMENDED Savings:
$45,916
Cost:
$51,422
$11,090 202,521 $12,526 2,433 $15,300 6,300 $7,000 75,000 $11,090
202,521
kWh
$12,526
2,433
MMBtu
$15,300
6,300
gal
$7,000
75,000
lb
TOTAL IMPLEMENTED Savings:
$14,646
Cost:
$15,166
$4,090 77,667 $10,556 2,050 - - - - $4,090
77,667
kWh
$10,556
2,050
MMBtu
-
-
gal
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ gal $ lb
Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (non-haz)