IAC logo
IAC Assessment: UL0101
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0101
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1994
Principal Product Porcelain Coated Metal
NAICS n/a
SIC 3465 - Automotive Stampings
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 93,000
Annual Production 190,000 Pounds
Production Hrs. Annual 5,880
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $205,574 3,617,820 kWh $0.06
Natural Gas $190,097 50,971 MMBtu $3.73
TOTAL ENERGY COSTS $395,671
RECOMMENDED SAVINGS* $19,558 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,975
Cost:
$8,590
$3,975 85,873 - - $3,975
85,873
kWh
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,444
Cost:
$696
$5,444 95,545 - - $5,444
95,545
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,055
Cost:
$3,163
$2,055 36,049 - - $2,055
36,049
kWh
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$420
Cost:
$150
$420 7,327 - - $420
7,327
kWh
-
-
MMBtu
05: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$3,325
Cost:
$10,000
- - $3,325 891 -
-
kWh
$3,325
891
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$791
Cost:
$588
- - $791 212 -
-
kWh
$791
212
MMBtu
07: 2.1114 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE Savings:
$3,085
Cost:
$1,000
- - $3,085 827 -
-
kWh
$3,085
827
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$463
Cost:
$558
- - $463 124 -
-
kWh
$463
124
MMBtu
TOTAL RECOMMENDED Savings:
$19,558
Cost:
$24,745
$11,894 224,794 $7,664 2,054 $11,894
224,794
kWh
$7,664
2,054
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas