IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,127

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0262 # 06 Y:1993 06 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $310 $200 Implemented
CO0262 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $310 $750 Not Implemented
CO0262 # 08 Y:1993 08 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $670 $460 Not Implemented
CO0262 # 09 Y:1993 09 1993 USE SYNTHETIC LUBRICANT $460 $0 Not Implemented
CO0262 # 10 Y:1993 10 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $420 Implemented
CO0262 # 11 Y:1993 11 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,210 $2,640 Not Implemented
AS0078 # 01 Y:1993 01 1993 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $167,933 $370,044 Not Implemented
AS0078 # 02 Y:1993 02 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $54,544 $70,044 Implemented
AS0078 # 03 Y:1993 03 1993 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $403 $1,200 Implemented
AS0078 # 04 Y:1993 04 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,061 $10,100 Not Implemented
AS0078 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,119 $0 Implemented
AS0078 # 06 Y:1993 06 1993 USE SYNTHETIC LUBRICANT $364 $0 Implemented
AS0078 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $219 $450 Not Implemented
TN0485 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $3,219 $3,110 Not Implemented
TN0485 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,103 $1,450 Not Implemented
TN0485 # 03 Y:1993 03 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $5,460 $0 Not Implemented
TN0485 # 04 Y:1993 04 1993 INSTALL TIMERS AND/OR THERMOSTATS $3,403 $2,160 Not Implemented
TN0485 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $633 $627 Not Implemented
TN0485 # 06 Y:1993 06 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $299 $160 Not Implemented
MO0077 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,862 $10,818 Implemented
MO0077 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,944 $872 Implemented
MO0077 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,913 $4,077 Implemented
MO0077 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $949 $245 Implemented
MO0077 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $607 $352 Implemented
MO0077 # 06 Y:1993 06 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $277 $285 Not Implemented