IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0054 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,034 $1,600 Not Implemented
MO0054 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $851 $1,522 Not Implemented
MO0054 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,364 $0 Not Implemented
MO0054 # 05 Y:1992 05 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,028 $20 Not Implemented
MO0054 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $746 $438 Not Implemented
MO0054 # 07 Y:1992 07 1992 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $192 $620 Implemented
MO0054 # 08 Y:1992 08 1992 RECOVER AND REUSE COOLING WATER $8,137 $12,000 Not Implemented
WI0142 # 01 Y:1992 01 1992 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,830 $314 Implemented
WI0142 # 02 Y:1992 02 1992 INSTALL SET-BACK TIMERS $1,233 $800 Implemented
WI0142 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $249 $244 Implemented
WI0142 # 04 Y:1992 04 1992 IMPROVE LUBRICATION PRACTICES $1,215 $0 Not Implemented
WI0142 # 05 Y:1992 05 1992 COVER OPEN TANKS $967 $500 Not Implemented
WI0142 # 06 Y:1992 06 1992 INSTALL STORM WINDOWS AND DOORS $1,208 $4,293 Implemented
WI0142 # 07 Y:1992 07 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $658 $0 Not Implemented
WI0142 # 08 Y:1992 08 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $601 $525 Implemented
WI0142 # 09 Y:1992 09 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $498 $0 Implemented
WI0142 # 10 Y:1992 10 1992 INSTALL TIMERS AND/OR THERMOSTATS $270 $400 Implemented
OK0369 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $1,250 $990 Implemented
OK0369 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,302 $7,440 Not Implemented
OK0369 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,038 $0 Implemented
OK0369 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $946 $0 Implemented
UF0021 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,886 $7,727 Not Implemented
UF0021 # 02 Y:1992 02 1992 INSTALL SPECTRAL REFLECTORS / DELAMP $15,608 $19,830 Not Implemented
UF0021 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $178 $1,003 Not Implemented
UF0021 # 04 Y:1992 04 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $494 $1,320 Not Implemented