IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,760

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0014 # 05 Y:1987 05 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $460 $300 Implemented
AM0014 # 06 Y:1987 06 1987 INSTALL TIMERS AND/OR THERMOSTATS $362 $500 Implemented
AM0014 # 07 Y:1987 07 1987 RECOVER WASTE HEAT FROM EQUIPMENT $460 $200 Not Implemented
AM0014 # 08 Y:1987 08 1987 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $283 $50 Implemented
AM0014 # 09 Y:1987 09 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $83 $67 Not Implemented
AM0003 # 01 Y:1987 01 1987 OPTIMIZE PLANT POWER FACTOR $7,269 $12,000 Not Implemented
AM0003 # 02 Y:1987 02 1987 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,130 $0 Not Implemented
AM0003 # 03 Y:1987 03 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,580 $255 Not Implemented
AM0003 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,838 $0 Not Implemented
AM0003 # 05 Y:1987 05 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $495 $0 Not Implemented
AM0003 # 06 Y:1987 06 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $785 $2,932 Implemented
AM0003 # 07 Y:1987 07 1987 RECOVER WASTE HEAT FROM EQUIPMENT $822 $500 Not Implemented
AM0003 # 08 Y:1987 08 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $82 $37 Implemented
LT0079 # 01 Y:1986 01 1986 INSTALL SET-BACK TIMERS $19,773 $2,150 Implemented
LT0079 # 02 Y:1986 02 1986 COVER OPEN TANKS $3,490 $800 Implemented
LT0079 # 03 Y:1986 03 1986 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $887 $1,800 Not Implemented
LT0079 # 04 Y:1986 04 1986 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $4,361 $750 Implemented
PV0005 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $437 $17 Not Implemented
PV0005 # 02 Y:1985 02 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,834 $0 Not Implemented
PV0006 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $175 $0 Not Implemented
PV0006 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $85 $0 Not Implemented
PV0003 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $478 $0 Not Implemented
PV0003 # 02 Y:1985 02 1985 USE RADIANT HEATER FOR SPOT HEATING $253 $1,650 Not Implemented
PV0004 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,014 $129 Not Implemented
PV0004 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,526 $27 Not Implemented