IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0087 # 09 Y:1990 09 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $285 $0 Implemented
RU0090 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,438 $0 Not Implemented
RU0090 # 02 Y:1990 02 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,197 $11,476 Not Implemented
RU0090 # 03 Y:1990 03 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $728 $68 Implemented
RU0090 # 04 Y:1990 04 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $348 $350 Implemented
RU0090 # 05 Y:1990 05 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $433 $0 Not Implemented
RU0090 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $176 $186 Not Implemented
RU0090 # 07 Y:1990 07 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,573 $500 Implemented
RU0090 # 08 Y:1990 08 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $547 $15 Implemented
AM0095 # 01 Y:1990 01 1990 REPAIR AND ELIMINATE STEAM LEAKS $75,970 $37,000 Not Implemented
AM0095 # 02 Y:1990 02 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $43,400 $101,400 Not Implemented
AM0095 # 03 Y:1990 03 1990 INCREASE AMOUNT OF CONDENSATE RETURNED $9,335 $17,000 Not Implemented
AM0095 # 04 Y:1990 04 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,505 $600 Not Implemented
AM0095 # 05 Y:1990 05 1990 OPTIMIZE PLANT POWER FACTOR $2,745 $7,875 Not Implemented
AM0095 # 06 Y:1990 06 1990 INSULATE BARE EQUIPMENT $2,256 $4,050 Not Implemented
AM0095 # 08 Y:1990 08 1990 INSTALL SET-BACK TIMERS $1,760 $0 Not Implemented
AM0095 # 09 Y:1990 09 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,185 $425 Not Implemented
AM0095 # 10 Y:1990 10 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164 $60 Not Implemented
UD0317 # 01 Y:1990 01 1990 MINIMIZE WATER USAGE $4,564 $4,200 Implemented
UD0317 # 02 Y:1990 02 1990 REDESIGN PROCESS $27,328 $30,000 Not Implemented
UD0317 # 03 Y:1990 03 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,080 $70,000 Not Implemented
KU0313 # 01 Y:1990 01 1990 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $16,847 $4,000 Not Implemented
KU0313 # 02 Y:1990 02 1990 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $11,447 $20,000 Implemented
KU0313 # 03 Y:1990 03 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,866 $80 Implemented
KU0313 # 04 Y:1990 04 1990 INSTALL TIMERS AND/OR THERMOSTATS $620 $100 Implemented