Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0070 # 03 Y:1989 03 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $971 $332 Implemented
RU0070 # 04 Y:1989 04 1989 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $16,973 $56,000 Not Implemented
RU0070 # 05 Y:1989 05 1989 RECOVER WASTE HEAT FROM EQUIPMENT $12,730 $3,000 Implemented
OK0296 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,120 $5,685 Implemented
OK0296 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $771 $1,425 Implemented
OK0296 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $156 $0 Implemented
OK0296 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $180 $155 Implemented
OK0296 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $542 $1,336 Implemented
OK0296 # 06 Y:1989 06 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $494 $0 Implemented
UD0302 # 01 Y:1990 01 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,135 $0 Implemented
UD0302 # 02 Y:1990 02 1990 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $4,863 $4,000 Implemented
UD0302 # 03 Y:1990 03 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,311 $0 Not Implemented
UD0302 # 04 Y:1990 04 1990 INSTALL SET-BACK TIMERS $795 $0 Not Implemented
UD0302 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $357 $700 Not Implemented
UD0302 # 06 Y:1990 06 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,637 $7,500 Not Implemented
UD0306 # 01 Y:1990 01 1990 OPTIMIZE PLANT POWER FACTOR $3,681 $6,000 Not Implemented
UD0306 # 02 Y:1990 02 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,994 $3,000 Not Implemented
UD0306 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $2,064 $4,000 Not Implemented
UD0306 # 04 Y:1990 04 1990 INSTALL SET-BACK TIMERS $3,650 $0 Not Implemented
UD0306 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,668 $100 Not Implemented
UD0299 # 01 Y:1989 01 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,009 $0 Not Implemented
UD0299 # 02 Y:1989 02 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $900 $0 Implemented
UD0299 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,667 $750 Implemented
UD0299 # 04 Y:1989 04 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $889 $750 Implemented
UD0299 # 05 Y:1989 05 1989 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,588 $1,720 Implemented