IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0042 # 03 Y:1988 03 1988 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,325 $1,200 Not Implemented
AM0042 # 04 Y:1988 04 1988 RECOVER WASTE HEAT FROM EQUIPMENT $1,145 $1,000 Not Implemented
AM0042 # 05 Y:1988 05 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $520 $520 Implemented
AM0042 # 06 Y:1988 06 1988 TURN OFF EQUIPMENT WHEN NOT IN USE $438 $150 Not Implemented
AM0042 # 07 Y:1988 07 1988 INSTALL TIMERS AND/OR THERMOSTATS $400 $1,000 Not Implemented
AM0042 # 08 Y:1988 08 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76 $220 Implemented
AM0042 # 09 Y:1988 09 1988 IMPROVE LUBRICATION PRACTICES $182 $0 Not Implemented
RU0039 # 05 Y:1988 05 1988 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,235 $1,040 Not Implemented
RU0039 # 06 Y:1988 06 1988 INSULATE BARE EQUIPMENT $248 $501 Not Implemented
RU0039 # 07 Y:1988 07 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,785 $1,260 Implemented
RU0039 # 08 Y:1988 08 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $116 $0 Implemented
RU0039 # 09 Y:1988 09 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $765 $0 Implemented
RU0039 # 01 Y:1988 01 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $304 $0 Not Implemented
RU0039 # 02 Y:1988 02 1988 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $722 $800 Not Implemented
RU0039 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,285 $0 Implemented
RU0039 # 04 Y:1988 04 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,583 $0 Implemented
CO0135 # 01 Y:1988 01 1988 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $1,130 $350 Implemented
CO0135 # 02 Y:1988 02 1988 COVER OPEN TANKS $1,554 $840 Not Implemented
CO0135 # 03 Y:1988 03 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $976 $1,000 Implemented
CO0135 # 04 Y:1988 04 1988 RECOVER WASTE HEAT FROM EQUIPMENT $638 $500 Not Implemented
CO0135 # 05 Y:1988 05 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $805 $200 Implemented
CO0135 # 06 Y:1988 06 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,230 $400 Implemented
CO0135 # 07 Y:1988 07 1988 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $250 $130 Not Implemented
CO0135 # 08 Y:1988 08 1988 INSTALL AUTOMATIC STACK DAMPER $653 $1,120 Implemented
CO0135 # 09 Y:1988 09 1988 DISCONNECT BALLASTS $540 $250 Implemented