IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,628

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0031 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,157 $454 Not Implemented
WI0031 # 04 Y:1988 04 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,548 $2,500 Implemented
WI0031 # 05 Y:1988 05 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,507 $0 Not Implemented
WI0031 # 06 Y:1988 06 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,350 $2,300 Implemented
CO0121 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,482 $2,800 Implemented
CO0121 # 02 Y:1988 02 1988 INCREASE AMOUNT OF CONDENSATE RETURNED $896 $200 Not Implemented
CO0121 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $321 $700 Not Implemented
CO0121 # 04 Y:1988 04 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,341 $2,000 Implemented
CO0121 # 05 Y:1988 05 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $567 $500 Implemented
CO0121 # 06 Y:1988 06 1988 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,817 $250 Implemented
CO0121 # 07 Y:1988 07 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,509 $1,517 Implemented
AM0036 # 01 Y:1988 01 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,240 $127,710 Not Implemented
AM0036 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,300 $0 Not Implemented
AM0036 # 03 Y:1988 03 1988 IMPROVE LUBRICATION PRACTICES $1,725 $0 Not Implemented
AM0036 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $390 $235 Not Implemented
AM0036 # 05 Y:1988 05 1988 INSULATE BARE EQUIPMENT $230 $74 Not Implemented
TN0344 # 01 Y:1988 01 1988 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $36,635 $0 Not Implemented
TN0344 # 02 Y:1988 02 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,098 $1,850 Implemented
TN0344 # 03 Y:1988 03 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,913 $5,000 Not Implemented
TN0344 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,521 $1,313 Implemented
TN0344 # 05 Y:1988 05 1988 IMPROVE LUBRICATION PRACTICES $982 $0 Not Implemented
TN0344 # 06 Y:1988 06 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $840 $1,200 Implemented
TN0344 # 07 Y:1988 07 1988 OPTIMIZE PLANT POWER FACTOR $6,206 $6,400 Not Implemented
AT0104 # 01 Y:1988 01 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,150 $1,265 Implemented
AT0104 # 02 Y:1988 02 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $622 $320 Implemented