IAC logo
IAC Assessment: WI0031
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0031
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1988
Principal Product STAMPINGS AND WASHERS
NAICS n/a
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 240
Plant Area (Sq.Ft.) 0
Annual Production 28,000,000 Pounds
Production Hrs. Annual 4,250
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $192,261 3,749,121 kWh $0.05
Natural Gas $88,998 22,279 MMBtu $3.99
TOTAL ENERGY COSTS $281,259
RECOMMENDED SAVINGS* $13,128 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,706
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,758
Cost:
$3,500
- - $4,758 1,193 - - -
-
kWh
$4,758
1,193
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,808
Cost:
$500
- - $1,908 478 $(-100) - -
-
kWh
$1,908
478
MMBtu
$(-100)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,157
Cost:
$454
$1,157 22,567 - - - - $1,157
22,567
kWh
-
-
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,548
Cost:
$2,500
$2,548 49,824 - - - - $2,548
49,824
kWh
-
-
MMBtu
-
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,507
Cost:
-
$2,707 - - - $(-1,200) - $2,707
-
kWh
-
-
MMBtu
$(-1,200)
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,350
Cost:
$2,300
$2,021 39,566 $(-671) (-168) - - $2,021
39,566
kWh
$(-671)
(-168)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$13,128
Cost:
$9,254
$8,433 111,957 $5,995 1,503 $(-1,300) - $8,433
111,957
kWh
$5,995
1,503
MMBtu
$(-1,300)
-
$
TOTAL IMPLEMENTED Savings:
$5,706
Cost:
$5,300
$4,569 89,390 $1,237 310 $(-100) - $4,569
89,390
kWh
$1,237
310
MMBtu
$(-100)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes