Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,175
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0142 # 18 Y:1984 | 18 | 1984 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $108 | $62 | Not Implemented |
KU0142 # 19 Y:1984 | 19 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $506 | $0 | Implemented |
KU0143 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,486 | $0 | Implemented |
KU0143 # 02 Y:1984 | 02 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,840 | $0 | Implemented |
KU0143 # 03 Y:1984 | 03 | 1984 | IMPROVE LUBRICATION PRACTICES | $3,966 | $0 | Not Implemented |
KU0143 # 04 Y:1984 | 04 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,586 | $3,000 | Implemented |
KU0143 # 05 Y:1984 | 05 | 1984 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $4,141 | $2,000 | Implemented |
KU0143 # 06 Y:1984 | 06 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,229 | $650 | Not Implemented |
KU0143 # 07 Y:1984 | 07 | 1984 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,043 | $1,200 | Not Implemented |
KU0143 # 08 Y:1984 | 08 | 1984 | INSULATE BARE EQUIPMENT | $755 | $500 | Not Implemented |
KU0143 # 09 Y:1984 | 09 | 1984 | INSULATE BARE EQUIPMENT | $663 | $1,200 | Not Implemented |
KU0143 # 10 Y:1984 | 10 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $620 | $920 | Implemented |
KU0143 # 11 Y:1984 | 11 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $548 | $0 | Not Implemented |
KU0143 # 12 Y:1984 | 12 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $454 | $300 | Not Implemented |
KU0143 # 13 Y:1984 | 13 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $183 | $0 | Implemented |
TS0007 # 01 Y:1984 | 01 | 1984 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $12,640 | $34,000 | Not Implemented |
TS0007 # 02 Y:1984 | 02 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $13,248 | $25,350 | Not Implemented |
TS0007 # 03 Y:1984 | 03 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,860 | $0 | Implemented |
TS0007 # 05 Y:1984 | 05 | 1984 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,243 | $0 | Implemented |
ST0002 # 01 Y:1984 | 01 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $306 | $0 | Implemented |
ST0002 # 02 Y:1984 | 02 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,941 | $40 | Implemented |
ST0002 # 03 Y:1984 | 03 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $845 | $80 | Implemented |
ST0002 # 04 Y:1984 | 04 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,150 | $310 | Implemented |
ST0002 # 05 Y:1984 | 05 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $386 | $182 | Not Implemented |
ST0002 # 06 Y:1984 | 06 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $450 | $537 | Implemented |