IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19,982

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0121 # 06 Y:1984 06 1984 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $323,750 $847,440 Not Implemented
OK0122 # 01 Y:1984 01 1984 RECOVER WASTE HEAT FROM EQUIPMENT $1,546 $346 Not Implemented
OK0122 # 02 Y:1984 02 1984 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $649 $235 Implemented
OK0122 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $874 $923 Implemented
OK0122 # 04 Y:1984 04 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,414 $290 Implemented
OK0122 # 05 Y:1984 05 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,584 $2,024 Implemented
OK0122 # 06 Y:1984 06 1984 AIR CONDITION ONLY SPACE NECESSARY $272 $70 Not Implemented
OK0122 # 07 Y:1984 07 1984 REDUCE VENTILATION AIR $316 $40 Implemented
OK0122 # 08 Y:1984 08 1984 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $435 $693 Implemented
OK0122 # 09 Y:1984 09 1984 INSTALL TIMERS AND/OR THERMOSTATS $5,840 $9,307 Implemented
OK0122 # 10 Y:1984 10 1984 OPTIMIZE PLANT POWER FACTOR $1,680 $6,550 Not Implemented
OK0113 # 01 Y:1984 01 1984 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $304 $280 Not Implemented
OK0113 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $198 $235 Implemented
OK0113 # 03 Y:1984 03 1984 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $680 $80 Not Implemented
OK0118 # 01 Y:1984 01 1984 COVER OPEN TANKS $1,452 $545 Not Implemented
OK0118 # 02 Y:1984 02 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $1,261 $460 Not Implemented
OK0118 # 03 Y:1984 03 1984 INSULATE BARE EQUIPMENT $281 $59 Not Implemented
OK0118 # 04 Y:1984 04 1984 INSULATE BARE EQUIPMENT $6,730 $2,046 Not Implemented
OK0118 # 05 Y:1984 05 1984 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $90 $208 Not Implemented
OK0118 # 06 Y:1984 06 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $51 $53 Not Implemented
OK0118 # 07 Y:1984 07 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $88 $27 Not Implemented
TN0181 # 01 Y:1983 01 1983 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $19,272 $11,460 Not Implemented
TN0181 # 02 Y:1983 02 1983 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,841 $10,000 Not Implemented
KU0110 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,125 $300 Not Implemented
KU0110 # 02 Y:1983 02 1983 INSTALL AUTOMATIC STACK DAMPER $1,012 $800 Implemented