Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,203
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0056 # 03 Y:1982 | 03 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,145 | $517,000 | Not Implemented |
TN0155 # 01 Y:1982 | 01 | 1982 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $29,118 | $6,200 | Not Implemented |
TN0155 # 02 Y:1982 | 02 | 1982 | INSULATE BARE EQUIPMENT | $2,125 | $168 | Not Implemented |
OK0062 # 01 Y:1982 | 01 | 1982 | INSULATE BARE EQUIPMENT | $82 | $450 | Implemented |
OK0062 # 02 Y:1982 | 02 | 1982 | USE MINIMUM SAFE OVEN VENTILATION | $1,749 | $0 | Implemented |
OK0062 # 03 Y:1982 | 03 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $337 | $285 | Implemented |
OK0062 # 04 Y:1982 | 04 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $909 | $599 | Implemented |
OK0062 # 05 Y:1982 | 05 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $130 | $690 | Implemented |
OK0059 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $473 | $283 | Not Implemented |
OK0059 # 02 Y:1982 | 02 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $204 | $600 | Not Implemented |
OK0059 # 03 Y:1982 | 03 | 1982 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $122 | $0 | Not Implemented |
OK0059 # 04 Y:1982 | 04 | 1982 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $230 | $1,137 | Implemented |
OK0059 # 05 Y:1982 | 05 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $422 | $500 | Not Implemented |
OK0059 # 06 Y:1982 | 06 | 1982 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,097 | $984 | Implemented |
UD0048 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,576 | $1,603 | Not Implemented |
UD0048 # 02 Y:1982 | 02 | 1982 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $4,904 | $2,500 | Not Implemented |
UD0048 # 03 Y:1982 | 03 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $815 | $600 | Not Implemented |
UD0048 # 04 Y:1982 | 04 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,992 | $1,000 | Not Implemented |
UD0051 # 01 Y:1982 | 01 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $460 | $0 | Implemented |
UD0051 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,295 | $753 | Implemented |
UD0051 # 03 Y:1982 | 03 | 1982 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $4,219 | $6,160 | Implemented |
UD0051 # 04 Y:1982 | 04 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,504 | $900 | Implemented |
UD0051 # 05 Y:1982 | 05 | 1982 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $3,312 | $1,500 | Not Implemented |
UD0052 # 01 Y:1982 | 01 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,538 | $900 | Not Implemented |
UD0052 # 02 Y:1982 | 02 | 1982 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $182,775 | $87,000 | Not Implemented |