Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
790
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0580 # 01 Y:1999 | 01 | 1999 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $862,392 | $1,300,000 | Not Implemented |
UD0580 # 02 Y:1999 | 02 | 1999 | $134,400 | $400,000 | Not Implemented | |
UD0580 # 03 Y:1999 | 03 | 1999 | RECOVER AND REUSE COOLING WATER | $52,000 | $140,000 | Not Implemented |
UD0580 # 04 Y:1999 | 04 | 1999 | $39,393 | $10,000 | Not Implemented | |
UD0580 # 05 Y:1999 | 05 | 1999 | USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER | $27,840 | $3,500 | Implemented |
UD0580 # 06 Y:1999 | 06 | 1999 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $27,804 | $11,744 | Implemented |
UD0580 # 07 Y:1999 | 07 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,051 | $30,337 | Implemented |
UD0580 # 08 Y:1999 | 08 | 1999 | FILTER AND REUSE HYDRAULIC OIL | $1,713 | $2,500 | Not Implemented |
UD0580 # 09 Y:1999 | 09 | 1999 | SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED | $1,418 | $0 | Not Implemented |
OD0144 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,762 | $39,160 | Not Implemented |
OD0144 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,069 | $900 | Not Implemented |
OD0144 # 03 Y:1999 | 03 | 1999 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $420 | $490 | Not Implemented |
OD0144 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,332 | $20 | Not Implemented |
OD0144 # 05 Y:1999 | 05 | 1999 | UPGRADE CONTROLS ON COMPRESSORS | $4,446 | $140 | Not Implemented |
ND0330 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,347 | $200 | Implemented |
ND0330 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $228 | $320 | Implemented |
ND0330 # 03 Y:1999 | 03 | 1999 | USE OPTIMUM TEMPERATURE | $15 | $10 | Implemented |
ND0330 # 04 Y:1999 | 04 | 1999 | INSULATE BARE EQUIPMENT | $3,950 | $3,800 | Implemented |
ND0330 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,337 | $1,000 | Not Implemented |
ND0330 # 06 Y:1999 | 06 | 1999 | OPTIMIZE PLANT POWER FACTOR | $5,430 | $4,252 | Implemented |
ND0330 # 07 Y:1999 | 07 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $131 | $350 | Not Implemented |
ND0330 # 08 Y:1999 | 08 | 1999 | REDUCE OR ELIMINATE WASTE | $1,067 | $95 | Implemented |
ND0330 # 09 Y:1999 | 09 | 1999 | MINIMIZE WATER USAGE | $821 | $960 | Not Implemented |
ND0330 # 10 Y:1999 | 10 | 1999 | $3,873 | $17,271 | Implemented | |
ND0330 # 11 Y:1999 | 11 | 1999 | USE SYNTHETIC LUBRICANT | $3,469 | $1,375 | Implemented |