IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

625

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0064 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $287 $24 Implemented
MI0064 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $233 $458 Not Implemented
MI0064 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $57,321 $6,188 Implemented
MI0064 # 05 Y:2003 05 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,458 $32,500 Not Implemented
MI0064 # 06 Y:2003 06 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,223 $9 Implemented
IA0323 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,618 $1,298 Implemented
IA0323 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,258 $304 Not Implemented
IA0323 # 03 Y:2003 03 2003 UPGRADE CONTROLS ON COMPRESSORS $4,635 $2,000 Not Implemented
IA0323 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $748 $737 Not Implemented
IA0323 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,455 $8,642 Implemented
IA0323 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $903 $1,639 Not Implemented
TA0061 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,140 $17,080 Implemented
TA0061 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,330 $240 Not Implemented
TA0061 # 03 Y:2003 03 2003 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,000 $300 Implemented
TA0061 # 04 Y:2003 04 2003 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,870 $435 Implemented
TA0061 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,100 $1,730 Not Implemented
TA0061 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $0 Implemented
TA0061 # 07 Y:2003 07 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $400 $0 Not Implemented
TA0061 # 08 Y:2003 08 2003 INSTALL OCCUPANCY SENSORS $350 $170 Not Implemented
TA0061 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $300 $283 Implemented
TA0061 # 10 Y:2003 10 2003 DISCONNECT BALLASTS $140 $270 Not Implemented
TA0061 # 11 Y:2003 11 2003 INSULATE BARE EQUIPMENT $140 $255 Not Implemented
TA0061 # 12 Y:2003 12 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $100 $0 Not Implemented
OK0667 # 01 Y:2003 01 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,098 $4,390 Not Implemented
OK0667 # 02 Y:2003 02 2003 RECOVER AND REUSE WASTE MATERIAL $1,957 $564 Not Implemented