IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

399

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0310 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,165 $1,896 Not Implemented
MZ0310 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $6,274 $490 Not Implemented
MZ0310 # 02 Y:2021 02 2021 BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED $3,630 $1,160 Not Implemented
MZ0310 # 03 Y:2021 03 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,250 $2,580 Not Implemented
NL0054 # 06 Y:2021 06 2021 ISOLATE HOT OR COLD EQUIPMENT $3,823 $1,018 Not Implemented
NL0054 # 03 Y:2021 03 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,166 $12,910 Not Implemented
NL0054 # 04 Y:2021 04 2021 RECOVER WASTE HEAT FROM EQUIPMENT $6,837 $18,456 Not Implemented
NL0054 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,528 $7,371 Not Implemented
NL0054 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $16,506 $12,500 Not Implemented
NL0054 # 08 Y:2021 08 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,217 $1,920 Not Implemented
NL0054 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,098 $4,000 Not Implemented
NL0054 # 02 Y:2021 02 2021 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $8,000 $16,000 Not Implemented
NL0054 # 09 Y:2021 09 2021 RECOVER AND REUSE WASTE MATERIAL $1,876 $6,000 Not Implemented
OK1041 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,337 $28,697 Implemented
OK1041 # 05 Y:2021 05 2021 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $614 $219 Implemented
OK1041 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,223 $1,690 Implemented
OK1041 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $896 $1,927 Implemented
OK1041 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $180 $0 Not Implemented
MZ0287 # 05 Y:2020 05 2020 RECOVER WASTE HEAT FROM EQUIPMENT $2,939 $356 Implemented
MZ0287 # 09 Y:2020 09 2020 USE PHOTOCELL CONTROLS $579 $847 Not Implemented
MZ0287 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,461 $1,310 Implemented
MZ0287 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,540 $2,484 Implemented
MZ0287 # 07 Y:2020 07 2020 OPTIMIZE PLANT POWER FACTOR $937 $4,000 Implemented
MZ0287 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,049 $14,550 Implemented
MZ0287 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $2,755 $5,978 Implemented