IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

113

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0110 # 04 Y:1983 04 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $465 $3,000 Implemented
TN0181 # 01 Y:1983 01 1983 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $19,272 $11,460 Not Implemented
TN0181 # 02 Y:1983 02 1983 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,841 $10,000 Not Implemented
KU0110 # 08 Y:1983 08 1983 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $162 $0 Not Implemented
KU0110 # 07 Y:1983 07 1983 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $162 $0 Not Implemented
KU0110 # 06 Y:1983 06 1983 INSTALL TIMERS AND/OR THERMOSTATS $445 $200 Not Implemented
TN0193 # 04 Y:1983 04 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $730 $529 Implemented
TN0193 # 03 Y:1983 03 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $175 $0 Implemented
TN0193 # 02 Y:1983 02 1983 INSTALL TIMERS AND/OR THERMOSTATS $1,146 $800 Not Implemented
TN0193 # 01 Y:1983 01 1983 REVISE SMOKE CLEANUP FROM OPERATIONS $657 $2,772 Implemented
KU0110 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,125 $300 Not Implemented
KU0110 # 02 Y:1983 02 1983 INSTALL AUTOMATIC STACK DAMPER $1,012 $800 Implemented
KU0110 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,606 $4,200 Implemented
KU0110 # 05 Y:1983 05 1983 SHUT OFF PILOTS IN STANDBY EQUIPMENT $200 $0 Not Implemented
OK0108 # 05 Y:1983 05 1983 INSTALL TIMERS AND/OR THERMOSTATS $203 $296 Implemented
OK0108 # 02 Y:1983 02 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,027 $700 Implemented
OK0108 # 04 Y:1983 04 1983 OPTIMIZE PLANT POWER FACTOR $596 $1,640 Not Implemented
TN0175 # 01 Y:1983 01 1983 USE RADIANT HEATER FOR SPOT HEATING $11,000 $53,000 Not Implemented
TN0175 # 02 Y:1983 02 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,977 $4,000 Not Implemented
TN0175 # 03 Y:1983 03 1983 INSTALL SET-BACK TIMERS $520 $0 Not Implemented
OK0108 # 06 Y:1983 06 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $102 $142 Implemented
OK0108 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,117 $22,000 Implemented
OK0108 # 01 Y:1983 01 1983 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,912 $11,990 Implemented
UD0091 # 01 Y:1983 01 1983 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $13,041 $4,710 Not Implemented
UD0092 # 04 Y:1983 04 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,590 $1,300 Not Implemented