IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

707

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0478 # 02 Y:2000 02 2000 INSULATE BARE EQUIPMENT $1,970 $2,360 Implemented
CO0478 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $510 $290 Implemented
CO0478 # 03 Y:2000 03 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,550 $5,200 Implemented
CO0478 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $400 $1,370 Implemented
CO0479 # 02 Y:2000 02 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,190 $2,500 Implemented
CO0479 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $179,700 $0 Not Implemented
CO0478 # 08 Y:2000 08 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $0 Implemented
CO0478 # 07 Y:2000 07 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $240 $300 Implemented
CO0479 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $400 $110 Implemented
CO0479 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,970 $17,900 n/a
CO0479 # 03 Y:2000 03 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,180 $12,990 Not Implemented
CO0478 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $280 $60 Implemented
GT0706 # 01 Y:2000 01 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $400 $0 n/a
GT0706 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,130 $2,890 n/a
CO0478 # 09 Y:2000 09 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $6,350 $12,000 Implemented
CO0479 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $390 $60 Not Implemented
GT0706 # 03 Y:2000 03 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,695 $0 n/a
GT0706 # 07 Y:2000 07 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,080 $6,100 n/a
CO0478 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,280 $4,000 Implemented
GT0706 # 02 Y:2000 02 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $1,875 $0 n/a
GT0706 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,224 $3,360 n/a
GT0706 # 04 Y:2000 04 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $28,255 $13,250 n/a
ND0366 # 01 Y:2000 01 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,569 $600 Not Implemented
ND0366 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $1,894 $600 Not Implemented
ND0366 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $561 $350 Not Implemented