Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
746
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0625 # 05 Y:2001 | 05 | 2001 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $868 | $230 | Implemented |
OK0625 # 07 Y:2001 | 07 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $53,200 | $30,400 | Implemented |
OK0628 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $75,988 | $752 | Implemented |
OK0625 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,851 | $84 | Implemented |
OK0625 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $376 | $476 | Implemented |
OK0628 # 10 Y:2001 | 10 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $42,112 | $100,000 | Not Implemented |
OK0628 # 09 Y:2001 | 09 | 2001 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $5,452 | $500 | Not Implemented |
OK0628 # 01 Y:2001 | 01 | 2001 | INSTALL SET-BACK TIMERS | $8,150 | $310 | Implemented |
OK0628 # 03 Y:2001 | 03 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,940 | $3,013 | Implemented |
OK0625 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,900 | $360 | Implemented |
OK0628 # 02 Y:2001 | 02 | 2001 | INSTALL OCCUPANCY SENSORS | $357 | $613 | Implemented |
OK0625 # 06 Y:2001 | 06 | 2001 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $39,782 | $95,000 | Implemented |
OK0625 # 04 Y:2001 | 04 | 2001 | INSTALL SET-BACK TIMERS | $2,642 | $1,408 | Not Implemented |
OK0628 # 04 Y:2001 | 04 | 2001 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,448 | $1,500 | Implemented |
OK0628 # 08 Y:2001 | 08 | 2001 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $456,570 | $93,000 | Not Implemented |
OK0628 # 05 Y:2001 | 05 | 2001 | INCREASE AMOUNT OF CONDENSATE RETURNED | $39,477 | $20,922 | Implemented |
OK0628 # 07 Y:2001 | 07 | 2001 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $20,767 | $5,653 | Not Implemented |
OR0404 # 04 Y:2001 | 04 | 2001 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $859 | $2,400 | Implemented |
OR0403 # 03 Y:2001 | 03 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,010 | $0 | Implemented |
OR0403 # 02 Y:2001 | 02 | 2001 | INSTALL AUTOMATIC PACKING EQUIPMENT | $18,830 | $27,000 | Not Implemented |
OR0403 # 04 Y:2001 | 04 | 2001 | ADD AREA LIGHTING SWITCHES | $645 | $1,400 | Not Implemented |
OR0404 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,457 | $1,102 | Implemented |
OR0403 # 01 Y:2001 | 01 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $20,460 | $860 | Implemented |
OR0404 # 03 Y:2001 | 03 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $546 | $1,065 | Implemented |
OR0404 # 01 Y:2001 | 01 | 2001 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $25,650 | $0 | Implemented |