IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

523

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0434 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,556 $740 Implemented
WI0434 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,280 $2,832 Not Implemented
WI0434 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $9,841 $25,000 Not Implemented
WI0434 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,746 $12,600 Not Implemented
WI0434 # 01 Y:2002 01 2002 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $133,384 $140,000 Not Implemented
WI0434 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $5,168 $11,700 Implemented
WI0434 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,191 $588 Implemented
TA0043 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $670 $0 Implemented
TA0043 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $101 $163 Not Implemented
TA0043 # 03 Y:2002 03 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,390 $0 Implemented
TA0043 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $140 $75 Not Implemented
TA0043 # 02 Y:2002 02 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,735 $0 Implemented
TA0043 # 01 Y:2002 01 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,980 $0 Implemented
UD0658 # 02 Y:2002 02 2002 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $20,837 $16,100 Implemented
UD0658 # 01 Y:2002 01 2002 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $962,280 $448,000 Implemented
UD0658 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,063 $8,000 Implemented
UD0658 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,826 $8,905 Not Implemented
UD0658 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $749 $0 Not Implemented
UD0658 # 05 Y:2002 05 2002 USE RADIANT HEATER FOR SPOT HEATING $4,586 $7,938 Not Implemented
UD0658 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,863 $1,050 Not Implemented
WI0429 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $514 $150 Implemented
WI0429 # 01 Y:2002 01 2002 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $49,518 $23,000 Not Implemented
WI0429 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $11,200 $25,000 Not Implemented
WI0429 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,146 $1,280 Not Implemented
WI0429 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $3,559 $2,900 Not Implemented