Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
456
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0372 # 01 Y:2005 | 01 | 2005 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $22,802 | $2,143 | Implemented |
UF0372 # 13 Y:2005 | 13 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $14,477 | $62,000 | Not Implemented |
UF0372 # 14 Y:2005 | 14 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,074,880 | $989 | Implemented |
UF0372 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,373 | $10,886 | Implemented |
UF0372 # 12 Y:2005 | 12 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,916 | $15,057 | Implemented |
UF0372 # 09 Y:2005 | 09 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $43,072 | $138,308 | Not Implemented |
UF0372 # 03 Y:2005 | 03 | 2005 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,383 | $0 | Implemented |
UF0372 # 11 Y:2005 | 11 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,054 | $4,144 | Implemented |
UF0372 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $3,070 | $1,427 | Not Implemented |
UF0372 # 10 Y:2005 | 10 | 2005 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $26,386 | $121,152 | Not Implemented |
UF0372 # 05 Y:2005 | 05 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,158 | $28,067 | Not Implemented |
UF0372 # 08 Y:2005 | 08 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,724 | $39,583 | Not Implemented |
UF0372 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,223 | $16,223 | Implemented |
UF0372 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $55,681 | $32,374 | Not Implemented |
MS0286 # 01 Y:2005 | 01 | 2005 | AIR CONDITION ONLY SPACE NECESSARY | $6,625 | $0 | Not Implemented |
AM0499 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,110 | $2,800 | Implemented |
AM0499 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,380 | $1,080 | Not Implemented |
AM0499 # 06 Y:2005 | 06 | 2005 | OPTIMIZE PLANT POWER FACTOR | $2,270 | $5,600 | Not Implemented |
AM0499 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,975 | $0 | Implemented |
AM0499 # 03 Y:2005 | 03 | 2005 | USE SYNTHETIC LUBRICANT | $11,335 | $0 | Implemented |
AM0499 # 02 Y:2005 | 02 | 2005 | REUSE RAGS UNTIL COMPLETELY SOILED | $12,000 | $0 | Implemented |
AM0499 # 08 Y:2005 | 08 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $735 | $0 | Implemented |
AM0499 # 01 Y:2005 | 01 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,800 | $27,700 | Implemented |
AM0499 # 10 Y:2005 | 10 | 2005 | USE OPTIMUM THICKNESS INSULATION | $270 | $40 | Not Implemented |
AM0499 # 09 Y:2005 | 09 | 2005 | USE OPTIMUM THICKNESS INSULATION | $505 | $35 | Not Implemented |