IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

347

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0845 # 05 Y:2011 05 2011 REDUCE HEAT GAIN BY WINDOW TINTING $533 $0 Not Implemented
UD0845 # 03 Y:2011 03 2011 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,285 $4,000 Implemented
UD0845 # 01 Y:2011 01 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $1,244 $500 Not Implemented
UD0845 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $534 $0 Implemented
UD0845 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $286 $1,500 Not Implemented
BD0401 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,081 $550 Not Implemented
BD0401 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,618 $17,144 Not Implemented
BD0401 # 05 Y:2011 05 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,724 $1,500 Not Implemented
BD0401 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $2,085 $900 Not Implemented
BD0401 # 01 Y:2011 01 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $5,625 $4,500 Not Implemented
BD0401 # 04 Y:2011 04 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,685 $3,000 Not Implemented
UM0397 # 01 Y:2011 01 2011 UPGRADE CONTROLS ON COMPRESSORS $5,033 $200 Implemented
UM0397 # 02 Y:2011 02 2011 RECOVER WASTE HEAT FROM EQUIPMENT $13,335 $30,200 Not Implemented
UM0397 # 03 Y:2011 03 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $239 $10 Implemented
TT0079 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $205 $0 Implemented
TT0079 # 06 Y:2011 06 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,937 $0 Implemented
TT0079 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $1,618 $0 Not Implemented
UM0398 # 03 Y:2011 03 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,186 $0 Implemented
TT0079 # 05 Y:2011 05 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $631 $0 Not Implemented
UM0398 # 01 Y:2011 01 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,500 $7,000 Not Implemented
UM0398 # 02 Y:2011 02 2011 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $8,496 $10,350 Not Implemented
TT0079 # 01 Y:2011 01 2011 DISCONNECT BALLASTS $508 $0 Implemented
UM0398 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $1,482 $1,157 Implemented
UM0398 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,477 $500 Implemented
TT0079 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $336 $0 Implemented