Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsSIC | 341 | Metal Cans And Shipping Containers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0189 # 11 Y:1986 | 11 | 1986 | REPAIR AND ELIMINATE STEAM LEAKS | $191 | $200 | Implemented |
KU0189 # 10 Y:1986 | 10 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $592 | $414 | Implemented |
KU0189 # 08 Y:1986 | 08 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,247 | $780 | Implemented |
KU0189 # 05 Y:1986 | 05 | 1986 | USE MINIMUM STEAM OPERATING PRESSURE | $775 | $0 | Implemented |
KU0189 # 02 Y:1986 | 02 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,071 | $8,000 | Implemented |
KU0189 # 01 Y:1986 | 01 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,480 | $6,000 | Implemented |
KU0130 # 16 Y:1984 | 16 | 1984 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $131 | $0 | Implemented |
KU0130 # 20 Y:1984 | 20 | 1984 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $105 | $0 | Implemented |
KU0130 # 19 Y:1984 | 19 | 1984 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $262 | $0 | Implemented |
KU0130 # 18 Y:1984 | 18 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $150 | $0 | Implemented |
KU0130 # 04 Y:1984 | 04 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $9,121 | $0 | Implemented |
KU0130 # 15 Y:1984 | 15 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $618 | $0 | Implemented |
KU0130 # 14 Y:1984 | 14 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,068 | $800 | Implemented |
KU0130 # 12 Y:1984 | 12 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,060 | $2,000 | Implemented |
KU0130 # 11 Y:1984 | 11 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $2,648 | $0 | Implemented |
KU0130 # 09 Y:1984 | 09 | 1984 | REPAIR AND ELIMINATE STEAM LEAKS | $830 | $0 | Implemented |
KU0130 # 08 Y:1984 | 08 | 1984 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $399 | $339 | Implemented |
KU0130 # 07 Y:1984 | 07 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,950 | $5,000 | Implemented |
KU0130 # 06 Y:1984 | 06 | 1984 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $6,561 | $5,090 | Implemented |
KU0130 # 05 Y:1984 | 05 | 1984 | IMPROVE LUBRICATION PRACTICES | $6,312 | $600 | Implemented |