IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

997

matching recommendations
Reset
SIC 341 Metal Cans And Shipping Containers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0086 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,790 $100 Not Implemented
DL0086 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,790 $160 Implemented
DL0086 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,740 $3,250 Implemented
DL0086 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,250 $9,900 Not Implemented
DL0086 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,500 $4,000 Implemented
DL0086 # 09 Y:2012 09 2012 RECOVER WASTE HEAT FROM EQUIPMENT $7,857 $2,500 Not Implemented
DL0086 # 10 Y:2012 10 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $466 $3,100 Not Implemented
DL0086 # 11 Y:2012 11 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $493 $450 Not Implemented
DL0086 # 12 Y:2012 12 2012 RECOVER WASTE HEAT FROM EQUIPMENT $8,850 $10,000 Not Implemented
DL0086 # 13 Y:2012 13 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,800 $9,700 Not Implemented
DL0086 # 14 Y:2012 14 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,250 $300 Not Implemented
MA0679 # 01 Y:2011 01 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $70,691 $20,000 Implemented
MA0679 # 02 Y:2011 02 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $45,173 $20,100 Implemented
MA0679 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $24,174 $55,000 Implemented
MA0679 # 04 Y:2011 04 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,015 $30,000 Implemented
MA0679 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $12,376 $55,750 Implemented
MA0679 # 06 Y:2011 06 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,785 $11,650 Implemented
IC0165 # 01 Y:2009 01 2009 $35 $81 Not Implemented
IC0165 # 02 Y:2009 02 2009 $56 $152 Not Implemented
IC0165 # 03 Y:2009 03 2009 $3,581 $0 Implemented
IC0165 # 04 Y:2009 04 2009 $573 $575 Implemented
IC0165 # 05 Y:2009 05 2009 $197 $485 Implemented
IC0165 # 06 Y:2009 06 2009 $41,095 $2,038 Not Implemented
IC0165 # 07 Y:2009 07 2009 $6,833 $45,400 Implemented
IC0165 # 08 Y:2009 08 2009 $465 $0 Not Implemented