IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

997

matching recommendations
Reset
SIC 341 Metal Cans And Shipping Containers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0336 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $154,719 $1,434,375 Not Implemented
WM0185 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,565 $28,700 Implemented
WM0185 # 02 Y:2023 02 2023 USE RADIANT HEATER FOR SPOT HEATING $10,088 $23,040 Not Implemented
WM0185 # 03 Y:2023 03 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,563 $4,800 Not Implemented
WM0185 # 04 Y:2023 04 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,178 $2,050 Not Implemented
WM0185 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $587 $243 Not Implemented
WM0185 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $471 $0 Implemented
WM0185 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $443 $1,250 Implemented
WM0185 # 08 Y:2023 08 2023 AIR CONDITION ONLY SPACE NECESSARY $426 $0 Implemented
LE0518 # 06 Y:2022 06 2022 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $114,025 $450,000 Not Implemented
LE0518 # 05 Y:2022 05 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $45,859 $175,000 Implemented
LE0518 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,077 $30,000 Implemented
LE0518 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,790 $8,800 Implemented
LE0518 # 02 Y:2022 02 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,190 $4,000 Implemented
LE0518 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,198 $2,600 Implemented
SF0579 # 10 Y:2021 10 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,437 $13,019 Implemented
SF0579 # 09 Y:2021 09 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,144 $23,308 Implemented
SF0579 # 08 Y:2021 08 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,024 $2,236 Implemented
SF0579 # 07 Y:2021 07 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,775 $8,827 Not Implemented
SF0579 # 06 Y:2021 06 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,583 $6,929 Implemented
SF0579 # 05 Y:2021 05 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,523 $11,498 Implemented
SF0579 # 04 Y:2021 04 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,201 $1,018 Implemented
SF0579 # 03 Y:2021 03 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $37,544 $0 Implemented
SF0579 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,525 $0 Implemented
SF0579 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,573 $100 Not Implemented