IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 341 Metal Cans And Shipping Containers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0529 # 03 Y:2008 03 2008 CONTROL PRESSURE ON STEAMER OPERATIONS $11,760 $1,000 Not Implemented
OR0529 # 02 Y:2008 02 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,400 $17,900 Not Implemented
OR0529 # 01 Y:2008 01 2008 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $8,800 $4,900 Not Implemented
OR0529 # 04 Y:2008 04 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,767 $4,515 Not Implemented
OR0522 # 04 Y:2007 04 2007 $900 $3,450 Not Implemented
OR0522 # 03 Y:2007 03 2007 $14,500 $10,000 Not Implemented
OR0522 # 02 Y:2007 02 2007 $49,400 $51,300 Not Implemented
OR0522 # 01 Y:2007 01 2007 $70,700 $200,000 Not Implemented
OR0082 # 03 Y:1990 03 1990 MINIMIZE WATER USAGE $870 $75 Implemented
OR0082 # 08 Y:1990 08 1990 OPTIMIZE PLANT POWER FACTOR $161 $450 Not Implemented
OR0082 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $498 $700 Implemented
OR0082 # 06 Y:1990 06 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $103 $182 Implemented
OR0082 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,055 $500 Implemented
OR0082 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $382 $240 Implemented
OR0082 # 02 Y:1990 02 1990 RECOVER WASTE HEAT FROM EQUIPMENT $2,608 $75 Implemented
OR0082 # 01 Y:1990 01 1990 INSTALL SET-BACK TIMERS $4,474 $0 Implemented
OR0007 # 01 Y:1987 01 1987 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,816 $20 Implemented
OR0007 # 10 Y:1987 10 1987 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $49 $80 Not Implemented
OR0007 # 09 Y:1987 09 1987 OPTIMIZE PLANT POWER FACTOR $2,736 $2,420 Implemented
OR0007 # 08 Y:1987 08 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,413 $3,346 Not Implemented
OR0007 # 07 Y:1987 07 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $8,339 $6,586 Not Implemented
OR0007 # 06 Y:1987 06 1987 RECOVER WASTE HEAT FROM EQUIPMENT $7,065 $5,550 Not Implemented
OR0007 # 05 Y:1987 05 1987 INSULATE BARE EQUIPMENT $677 $168 Not Implemented
OR0007 # 04 Y:1987 04 1987 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,646 $1,700 Not Implemented
OR0007 # 03 Y:1987 03 1987 REDUCE VENTILATION AIR $4,062 $11 Implemented