IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 341 Metal Cans And Shipping Containers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0669 # 02 Y:2014 02 2014 METER WASTE WATER $20,590 $4,500 Implemented
AM0669 # 03 Y:2014 03 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,410 $0 Implemented
AM0669 # 04 Y:2014 04 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,332 $3,600 Implemented
AM0669 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,663 $12,000 Implemented
AM0669 # 06 Y:2014 06 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,800 $315 Not Implemented
AM0669 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,186 $570 Implemented
AM0669 # 08 Y:2014 08 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $950 $44 Implemented
AM0669 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,407 $52 Implemented
WV0480 # 06 Y:2014 06 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,967 $1,000 Implemented
WV0480 # 12 Y:2014 12 2014 DEVELOP A REPAIR/REPLACE POLICY $783 $396 Implemented
WV0480 # 11 Y:2014 11 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $934 $1,078 Implemented
WV0480 # 10 Y:2014 10 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,088 $500 Implemented
WV0480 # 09 Y:2014 09 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,181 $2,188 Not Implemented
WV0480 # 08 Y:2014 08 2014 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,520 $894 Not Implemented
WV0480 # 07 Y:2014 07 2014 OPTIMIZE PLANT POWER FACTOR $2,869 $13,803 Not Implemented
WV0480 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,543 $3,291 Implemented
WV0480 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $4,140 $2,788 Not Implemented
WV0480 # 03 Y:2014 03 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,929 $2,475 Not Implemented
WV0480 # 02 Y:2014 02 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,078 $11,520 Not Implemented
WV0480 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,022 $11,662 Implemented
AM0649 # 01 Y:2014 01 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $112,575 $24,000 Implemented
AM0649 # 02 Y:2014 02 2014 INSTALL EQUIPMENT TO MOVE PRODUCT $108,485 $9,000 Not Implemented
AM0649 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,490 $150 Not Implemented
AM0649 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $8,110 $200 Not Implemented
AM0649 # 05 Y:2014 05 2014 USE SYNTHETIC LUBRICANT $3,690 $0 Implemented