Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
765
matching recommendationsSIC | 3411 | Metal Cans |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0076 # 07 Y:2022 | 07 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,084 | $35 | Not Implemented |
MZ0336 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $1,963 | $2,020 | Implemented |
MZ0336 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,175 | $53,900 | Implemented |
MZ0336 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $774 | $0 | Not Implemented |
MZ0336 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,688 | $5,500 | Not Implemented |
MZ0336 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $31,782 | $11,200 | Implemented |
MZ0336 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $154,719 | $1,434,375 | Not Implemented |
WM0185 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,565 | $28,700 | Implemented |
WM0185 # 02 Y:2023 | 02 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $10,088 | $23,040 | Not Implemented |
WM0185 # 03 Y:2023 | 03 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,563 | $4,800 | Not Implemented |
WM0185 # 04 Y:2023 | 04 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $3,178 | $2,050 | Not Implemented |
WM0185 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $587 | $243 | Not Implemented |
WM0185 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $471 | $0 | Implemented |
WM0185 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $443 | $1,250 | Implemented |
WM0185 # 08 Y:2023 | 08 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $426 | $0 | Implemented |
LE0518 # 06 Y:2022 | 06 | 2022 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $114,025 | $450,000 | Not Implemented |
LE0518 # 05 Y:2022 | 05 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $45,859 | $175,000 | Implemented |
LE0518 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,077 | $30,000 | Implemented |
LE0518 # 03 Y:2022 | 03 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,790 | $8,800 | Implemented |
LE0518 # 02 Y:2022 | 02 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,190 | $4,000 | Implemented |
LE0518 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,198 | $2,600 | Implemented |
SF0579 # 10 Y:2021 | 10 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,437 | $13,019 | Implemented |
SF0579 # 09 Y:2021 | 09 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,144 | $23,308 | Implemented |
SF0579 # 08 Y:2021 | 08 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,024 | $2,236 | Implemented |
SF0579 # 07 Y:2021 | 07 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,775 | $8,827 | Not Implemented |