IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

549

matching recommendations
Reset
SIC 342 Cutlery, Handtools, And Hardware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0085 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $86 $74 Implemented
AM0085 # 07 Y:1990 07 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $407 $480 Implemented
AM0085 # 09 Y:1990 09 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $240 $0 Implemented
AM0085 # 10 Y:1990 10 1990 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $210 $200 Implemented
AM0085 # 11 Y:1990 11 1990 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $160 $0 Implemented
MA0175 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $385 $0 Implemented
MA0175 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,216 $5,256 Implemented
MA0175 # 05 Y:1990 05 1990 OPTIMIZE PLANT POWER FACTOR $1,528 $2,710 Implemented
RU0083 # 01 Y:1990 01 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,358 $325 Implemented
RU0083 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,191 $2,368 Implemented
RU0083 # 04 Y:1990 04 1990 AIR CONDITION ONLY SPACE NECESSARY $3,851 $6,100 Implemented
RU0083 # 06 Y:1990 06 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $17,662 $0 Implemented
UD0302 # 01 Y:1990 01 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,135 $0 Implemented
UD0302 # 02 Y:1990 02 1990 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $4,863 $4,000 Implemented
MA0150 # 02 Y:1989 02 1989 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $2,258 $3,032 Implemented
MA0150 # 03 Y:1989 03 1989 INSTALL TIMERS AND/OR THERMOSTATS $3,394 $2,099 Implemented
TN0361 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,381 $1,110 Implemented
TN0361 # 03 Y:1989 03 1989 USE RADIANT HEATER FOR SPOT HEATING $2,488 $5,550 Implemented
TN0361 # 07 Y:1989 07 1989 INSTALL TIMERS AND/OR THERMOSTATS $2,339 $680 Implemented
TN0361 # 08 Y:1989 08 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,021 $0 Implemented
TN0361 # 10 Y:1989 10 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,587 $780 Implemented
TN0361 # 11 Y:1989 11 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $82 $50 Implemented
TN0361 # 13 Y:1989 13 1989 OPTIMIZE PLANT POWER FACTOR $37,840 $35,000 Implemented
MA0134 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $556 $1,340 Implemented
MA0134 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $3,972 $918 Implemented