Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 342 | Cutlery, Handtools, And Hardware |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0398 # 06 Y:1993 | 06 | 1993 | UPGRADE CONTROLS ON COMPRESSORS | $5,166 | $800 | Implemented |
UD0398 # 04 Y:1993 | 04 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $156 | $200 | Implemented |
UD0398 # 02 Y:1993 | 02 | 1993 | REDUCE FLUID FLOW RATES | $7,396 | $5,000 | Implemented |
UD0358 # 06 Y:1991 | 06 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $959 | $0 | Implemented |
UD0358 # 05 Y:1991 | 05 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,636 | $0 | Implemented |
UD0358 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,170 | $0 | Implemented |
UD0358 # 03 Y:1991 | 03 | 1991 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $2,145 | $200 | Implemented |
UD0358 # 02 Y:1991 | 02 | 1991 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $675 | $0 | Implemented |
UD0358 # 01 Y:1991 | 01 | 1991 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $10,464 | $7,000 | Implemented |
UD0302 # 02 Y:1990 | 02 | 1990 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $4,863 | $4,000 | Implemented |
UD0302 # 01 Y:1990 | 01 | 1990 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,135 | $0 | Implemented |
UD0252 # 07 Y:1988 | 07 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $506 | $1,000 | Implemented |
UD0252 # 06 Y:1988 | 06 | 1988 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,267 | $4,098 | Implemented |
UD0252 # 04 Y:1988 | 04 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,667 | $9,550 | Implemented |
UD0252 # 03 Y:1988 | 03 | 1988 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $508 | $600 | Implemented |
UD0252 # 02 Y:1988 | 02 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $638 | $902 | Implemented |
UD0252 # 01 Y:1988 | 01 | 1988 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $25,000 | $0 | Implemented |
UD0058 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,729 | $2,704 | Implemented |
UD0060 # 05 Y:1982 | 05 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $618 | $0 | Implemented |
UD0060 # 04 Y:1982 | 04 | 1982 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $28,230 | $46,000 | Implemented |
UD0060 # 02 Y:1982 | 02 | 1982 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,089 | $1,000 | Implemented |
UD0060 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,603 | $4,366 | Implemented |
UD0058 # 04 Y:1982 | 04 | 1982 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,600 | $4,500 | Implemented |