IAC Assessment: UD0302
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0302
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1990
Principal Product UNDERWATER PELLETIZERS
NAICS n/a
SIC 3423 - Hand And Edge Tools, Nec
Sales $5,000,000-$10,000,000
# of Employees 56
Plant Area (Sq.Ft.) 0
Annual Production 4,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,181 1,427,902 kWh $0.06
Natural Gas $24,202 5,705 MMBtu $4.24
TOTAL ENERGY COSTS $115,383
RECOMMENDED SAVINGS* $12,098 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,998
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$2,135
Cost:
-
$2,135 87,632 - - - - $2,135
87,632
kWh
-
-
MMBtu
-
-
$
02: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$4,863
Cost:
$4,000
$4,863 - - - - - $4,863
-
kWh
-
-
MMBtu
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,311
Cost:
-
$1,311 - - - - - $1,311
-
kWh
-
-
MMBtu
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$795
Cost:
-
$840 17,878 $(-110) (-27) $65 - $840
17,878
kWh
$(-110)
(-27)
MMBtu
$65
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$357
Cost:
$700
$411 8,792 $(-54) (-13) - - $411
8,792
kWh
$(-54)
(-13)
MMBtu
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,637
Cost:
$7,500
- - $2,637 656 - - -
-
kWh
$2,637
656
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$12,098
Cost:
$12,200
$9,560 114,302 $2,473 616 $65 - $9,560
114,302
kWh
$2,473
616
MMBtu
$65
-
$
TOTAL IMPLEMENTED Savings:
$6,998
Cost:
$4,000
$6,998 87,632 - - - - $6,998
87,632
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes