IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 342 Cutlery, Handtools, And Hardware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1059 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $471 $0 Implemented
OK1059 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,353 $8,612 Implemented
OK0948 # 11 Y:2016 11 2016 OPTIMIZE PLANT POWER FACTOR $7,251 $25,830 Implemented
OK0948 # 09 Y:2016 09 2016 USE OPTIMUM THICKNESS INSULATION $58 $203 Implemented
OK0948 # 08 Y:2016 08 2016 USE OPTIMUM THICKNESS INSULATION $382 $1,310 Implemented
OK0948 # 06 Y:2016 06 2016 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $27,228 $83,600 Implemented
OK0948 # 02 Y:2016 02 2016 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,510 $2,320 Implemented
OK0922 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,204 $77,600 Implemented
OK0922 # 07 Y:2015 07 2015 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $2,660 $720 Implemented
OK0922 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,502 $30,324 Implemented
OK0906 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,273 $600 Implemented
OK0814 # 01 Y:2011 01 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $262,832 $1,710,000 Implemented
OK0814 # 02 Y:2011 02 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $189,220 $20,000 Implemented
OK0814 # 03 Y:2011 03 2011 INSTALL EQUIPMENT TO MOVE PRODUCT $1,364,602 $235,960 Implemented
OK0814 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,049 $15,319 Implemented
OK0153 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $89 $75 Implemented
OK0122 # 08 Y:1984 08 1984 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $435 $693 Implemented
OK0122 # 09 Y:1984 09 1984 INSTALL TIMERS AND/OR THERMOSTATS $5,840 $9,307 Implemented
OK0122 # 07 Y:1984 07 1984 REDUCE VENTILATION AIR $316 $40 Implemented
OK0122 # 05 Y:1984 05 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,584 $2,024 Implemented
OK0122 # 04 Y:1984 04 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,414 $290 Implemented
OK0122 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $874 $923 Implemented
OK0122 # 02 Y:1984 02 1984 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $649 $235 Implemented