Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsSIC | 342 | Cutlery, Handtools, And Hardware |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0372 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,373 | $10,886 | Implemented |
UF0372 # 14 Y:2005 | 14 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,074,880 | $989 | Implemented |
UF0372 # 13 Y:2005 | 13 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $14,477 | $62,000 | Not Implemented |
UF0372 # 12 Y:2005 | 12 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,916 | $15,057 | Implemented |
UF0372 # 11 Y:2005 | 11 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,054 | $4,144 | Implemented |
UF0372 # 10 Y:2005 | 10 | 2005 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $26,386 | $121,152 | Not Implemented |
UF0372 # 09 Y:2005 | 09 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $43,072 | $138,308 | Not Implemented |
UF0372 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,223 | $16,223 | Implemented |
UF0372 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $55,681 | $32,374 | Not Implemented |
UF0372 # 05 Y:2005 | 05 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,158 | $28,067 | Not Implemented |
UF0372 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $3,070 | $1,427 | Not Implemented |
UF0372 # 03 Y:2005 | 03 | 2005 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,383 | $0 | Implemented |
UF0372 # 01 Y:2005 | 01 | 2005 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $22,802 | $2,143 | Implemented |
UF0372 # 08 Y:2005 | 08 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,724 | $39,583 | Not Implemented |
MI0003 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,044 | $312 | Implemented |
MI0003 # 06 Y:2001 | 06 | 2001 | MOVE PRODUCT USING MECHANICAL MEANS | $40,000 | $2,900 | Implemented |
MI0003 # 05 Y:2001 | 05 | 2001 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $125,000 | $136,000 | Not Implemented |
MI0003 # 04 Y:2001 | 04 | 2001 | METER WASTE WATER | $25,076 | $3,650 | Not Implemented |
MI0003 # 02 Y:2001 | 02 | 2001 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $40,000 | $15,120 | Not Implemented |
MI0003 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,015 | $10,000 | Not Implemented |
UF0202 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,250 | $42,433 | Not Implemented |
UF0202 # 02 Y:1998 | 02 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,090 | $200 | Not Implemented |
UF0202 # 12 Y:1998 | 12 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $4,615 | $4,000 | Not Implemented |
UF0202 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,310 | $1,200 | Not Implemented |
UF0202 # 04 Y:1998 | 04 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,241 | $4,206 | Not Implemented |