Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsSIC | 342 | Cutlery, Handtools, And Hardware |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0882 # 09 Y:2011 | 09 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $47,117 | $155,150 | Implemented |
GT0882 # 08 Y:2011 | 08 | 2011 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $85,358 | $222,000 | Not Implemented |
GT0882 # 07 Y:2011 | 07 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $17,800 | $38,640 | Implemented |
GT0882 # 06 Y:2011 | 06 | 2011 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $31,792 | $136,000 | Implemented |
GT0882 # 05 Y:2011 | 05 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $16,076 | $55,000 | Implemented |
GT0882 # 04 Y:2011 | 04 | 2011 | METER WASTE WATER | $3,614 | $6,000 | Not Implemented |
GT0882 # 03 Y:2011 | 03 | 2011 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $28,143 | $70,000 | Not Implemented |
GT0882 # 02 Y:2011 | 02 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,201 | $0 | Not Implemented |
GT0882 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,634 | $0 | Implemented |
GT0651 # 02 Y:1998 | 02 | 1998 | COVER OPEN TANKS | $21,415 | $6,174 | Not Implemented |
GT0651 # 08 Y:1998 | 08 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $105,300 | $120,000 | Not Implemented |
GT0651 # 07 Y:1998 | 07 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $2,099 | $0 | Not Implemented |
GT0651 # 06 Y:1998 | 06 | 1998 | RECOVER AND REUSE WASTE MATERIAL | $16,208 | $38,860 | Not Implemented |
GT0651 # 05 Y:1998 | 05 | 1998 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,004 | $413 | Not Implemented |
GT0651 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,505 | $3,933 | Not Implemented |
GT0651 # 03 Y:1998 | 03 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,874 | $52,766 | Not Implemented |
GT0651 # 01 Y:1998 | 01 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,260 | $3,100 | Not Implemented |
GT0457 # 03 Y:1992 | 03 | 1992 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,340 | $800 | Not Implemented |
GT0457 # 04 Y:1992 | 04 | 1992 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,540 | $0 | Not Implemented |
GT0457 # 05 Y:1992 | 05 | 1992 | INSTALL TIMERS AND/OR THERMOSTATS | $5,540 | $3,900 | Not Implemented |
GT0457 # 02 Y:1992 | 02 | 1992 | INSTALL SET-BACK TIMERS | $1,450 | $0 | Not Implemented |
GT0457 # 01 Y:1992 | 01 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,507 | $6,820 | Not Implemented |