IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

80

matching recommendations
Reset
SIC 342 Cutlery, Handtools, And Hardware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0234 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,041 $3,675 Not Implemented
TT0234 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,207 $3,000 Not Implemented
TT0234 # 03 Y:2020 03 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,742 $3,800 Not Implemented
TT0234 # 02 Y:2020 02 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,187 $15,000 Not Implemented
TT0234 # 01 Y:2020 01 2020 INSTALL TIMERS AND/OR THERMOSTATS $18,933 $450 Not Implemented
TT0103 # 01 Y:2012 01 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $19,502 $0 Implemented
TT0103 # 02 Y:2012 02 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,152 $35,480 Not Implemented
TT0103 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,318 $5,300 Implemented
TT0103 # 04 Y:2012 04 2012 STANDARDIZE MOTOR INVENTORY $0 $0 Not Implemented
TT0103 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $35,332 $1,960 Not Implemented
GT0784 # 08 Y:2004 08 2004 METER WASTE WATER $4,010 $1,100 Implemented
GT0784 # 10 Y:2004 10 2004 CONTROL PRESSURE ON STEAMER OPERATIONS $14,204 $29,000 Not Implemented
GT0784 # 06 Y:2004 06 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $40,320 $5,000 Not Implemented
GT0784 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,866 $1,000 Implemented
GT0784 # 04 Y:2004 04 2004 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $14,255 $35,020 Not Implemented
GT0784 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $20,500 $1,200 Implemented
GT0784 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,015 $1,782 Not Implemented
GT0784 # 05 Y:2004 05 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $51,264 $0 Not Implemented
GT0784 # 09 Y:2004 09 2004 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,685 $4,550 Not Implemented
GT0784 # 07 Y:2004 07 2004 MINIMIZE WATER USAGE $7,400 $1,840 Implemented
TN0695 # 09 Y:2000 09 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,800 $5,510 n/a
TN0695 # 08 Y:2000 08 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,245 $0 n/a
TN0695 # 06 Y:2000 06 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,730 $1,175 n/a
TN0695 # 05 Y:2000 05 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $26,200 $18,500 n/a
TN0695 # 02 Y:2000 02 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $52,800 $320 n/a