IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 342 Cutlery, Handtools, And Hardware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0474 # 06 Y:2000 06 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $371 $100 Implemented
MA0474 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,827 $1,000 Implemented
MA0474 # 02 Y:2000 02 2000 INSTALL TIMERS AND/OR THERMOSTATS $4,760 $0 Implemented
MA0474 # 03 Y:2000 03 2000 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $2,838 $13,000 Not Implemented
MA0474 # 04 Y:2000 04 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $746 $4,000 Not Implemented
MA0474 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $512 $1,000 Implemented
TN0695 # 04 Y:2000 04 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $28,960 $52,400 n/a
TN0695 # 02 Y:2000 02 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $52,800 $320 n/a
TN0695 # 03 Y:2000 03 2000 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $50,645 $5,075 n/a
TN0695 # 07 Y:2000 07 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,015 $21,850 n/a
TN0695 # 05 Y:2000 05 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $26,200 $18,500 n/a
TN0695 # 06 Y:2000 06 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,730 $1,175 n/a
TN0695 # 01 Y:2000 01 2000 MODIFY CURRENT INCENTIVE PROGRAM $80,000 $16,690 n/a
TN0695 # 11 Y:2000 11 2000 INSTALL TIMERS AND/OR THERMOSTATS $2,160 $2,820 n/a
TN0695 # 10 Y:2000 10 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $2,880 $1,850 n/a
TN0695 # 09 Y:2000 09 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,800 $5,510 n/a
TN0695 # 08 Y:2000 08 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,245 $0 n/a
AR0193 # 01 Y:2000 01 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,366 $4,860 Not Implemented
AR0193 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,115 $30 Implemented
AR0193 # 03 Y:2000 03 2000 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $2,360 $3,000 Implemented
AR0193 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $553 $653 Implemented
AR0193 # 05 Y:2000 05 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $186 $0 Not Implemented
AR0193 # 06 Y:2000 06 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $21,302 $8,000 Implemented
AR0193 # 07 Y:2000 07 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $23,524 $1,000 Implemented
NC0187 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,836 $1,000 Not Implemented