IAC Assessment: NC0187
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0187
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2000
Principal Product Metal ties
NAICS n/a
SIC 3429 - Hardware, Nec
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 113,060
Annual Production 2,147,483,647 Pieces
Production Hrs. Annual 4,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $335,816 7,388,922 kWh $0.05
Electricity Demand $105,581 19,105 kW-months/year $5.53
Electricity Fees $17,094 - $ -
LPG $68,143 9,110 MMBtu $7.48
TOTAL ENERGY COSTS $526,709
RECOMMENDED SAVINGS* $51,000 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Increase in Production Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Increase in Production
$ kWh $ kW-months/year $ MMBtu $ lb $ %
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,836
Cost:
$1,000
$2,079 45,721 $757 137 - - - - - - $2,079
45,721
kWh
$757
137
kW-months/year
-
-
MMBtu
-
-
lb
-
-
%
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$10,033
Cost:
$5,000
$10,033 220,692 - - - - - - - - $10,033
220,692
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
%
03: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$975
Cost:
$2,640
$784 17,292 $191 34 - - - - - - $784
17,292
kWh
$191
34
kW-months/year
-
-
MMBtu
-
-
lb
-
-
%
04: 2.5196 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS Savings:
$7,128
Cost:
$20,000
$5,223 114,889 $1,905 344 - - - - - - $5,223
114,889
kWh
$1,905
344
kW-months/year
-
-
MMBtu
-
-
lb
-
-
%
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$689
Cost:
$1,428
$399 8,499 $290 52 - - - - - - $399
8,499
kWh
$290
52
kW-months/year
-
-
MMBtu
-
-
lb
-
-
%
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$17,072
Cost:
$24,000
$17,072 375,440 - - - - - - - - $17,072
375,440
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
%
07: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$3,506
Cost:
$5,416
- - - - $3,506 469 - - - - -
-
kWh
-
-
kW-months/year
$3,506
469
MMBtu
-
-
lb
-
-
%
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$75
Cost:
$260
- - - - - - $75 5,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$75
5,000
lb
-
-
%
09: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$8,686
Cost:
$25,740
$(-13,728) (-301,876) $(-4,436) (-802) $18,850 2,520 - - $8,000 - $(-13,728)
(-301,876)
kWh
$(-4,436)
(-802)
kW-months/year
$18,850
2,520
MMBtu
-
-
lb
$8,000
-
%
TOTAL RECOMMENDED Savings:
$51,000
Cost:
$85,484
$21,862 480,657 $(-1,293) (-235) $22,356 2,989 $75 5,000 $8,000 - $21,862
480,657
kWh
$(-1,293)
(-235)
kW-months/year
$22,356
2,989
MMBtu
$75
5,000
lb
$8,000
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ %
Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Increase in Production Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Increase in Production