IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 342 Cutlery, Handtools, And Hardware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0733 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $750 n/a
CO0733 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,360 $5,950 n/a
CO0733 # 04 Y:2016 04 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,970 $34,800 n/a
CO0733 # 05 Y:2016 05 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,200 $500 n/a
CO0733 # 06 Y:2016 06 2016 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $2,200 $9,200 n/a
CO0733 # 01 Y:2016 01 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,020 $1,730 n/a
OK0949 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,319 $5,020 Not Implemented
OK0949 # 02 Y:2016 02 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,613 $3,847 Not Implemented
OK0949 # 01 Y:2016 01 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $17,826 $50,400 Not Implemented
OK0949 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $720 $1,313 Not Implemented
OK0949 # 05 Y:2016 05 2016 OPERATE BOILERS ON HIGH FIRE SETTING $10,228 $44,000 Not Implemented
OK0949 # 07 Y:2016 07 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $74,759 $284,084 Not Implemented
OK0949 # 08 Y:2016 08 2016 OPTIMIZE PLANT POWER FACTOR $11,423 $30,600 Not Implemented
OK0949 # 06 Y:2016 06 2016 COVER OPEN TANKS $9,702 $850 Not Implemented
OK0948 # 01 Y:2016 01 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,142 $29,000 Not Implemented
OK0948 # 10 Y:2016 10 2016 USE POWER DURING OFF-PEAK PERIODS $12,184 $0 Not Implemented
OK0948 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,007 $926 Not Implemented
OK0948 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,857 $18,014 Not Implemented
OK0948 # 03 Y:2016 03 2016 USE PHOTOCELL CONTROLS $862 $3,870 Not Implemented
OK0948 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,797 $118,583 Not Implemented
OK0948 # 09 Y:2016 09 2016 USE OPTIMUM THICKNESS INSULATION $58 $203 Implemented
OK0948 # 08 Y:2016 08 2016 USE OPTIMUM THICKNESS INSULATION $382 $1,310 Implemented
OK0948 # 06 Y:2016 06 2016 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $27,228 $83,600 Implemented
OK0948 # 02 Y:2016 02 2016 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,510 $2,320 Implemented
OK0948 # 11 Y:2016 11 2016 OPTIMIZE PLANT POWER FACTOR $7,251 $25,830 Implemented