Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
95
matching recommendationsSIC | 3421 | Cutlery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0234 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,207 | $3,000 | Not Implemented |
TT0234 # 01 Y:2020 | 01 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $18,933 | $450 | Not Implemented |
TT0234 # 02 Y:2020 | 02 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,187 | $15,000 | Not Implemented |
TT0234 # 05 Y:2020 | 05 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,041 | $3,675 | Not Implemented |
TT0234 # 03 Y:2020 | 03 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,742 | $3,800 | Not Implemented |
UA0199 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,483 | $9,013 | Implemented |
UA0199 # 05 Y:2018 | 05 | 2018 | OPTIMIZE PLANT POWER FACTOR | $1,129 | $2,568 | Not Implemented |
UA0199 # 08 Y:2018 | 08 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $604 | $919 | Implemented |
UA0199 # 06 Y:2018 | 06 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $182 | $698 | Implemented |
UA0199 # 07 Y:2018 | 07 | 2018 | USE OPTIMUM THICKNESS INSULATION | $1,396 | $453 | Not Implemented |
UA0199 # 09 Y:2018 | 09 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $253 | $200 | Not Implemented |
UA0199 # 03 Y:2018 | 03 | 2018 | INSTALL OCCUPANCY SENSORS | $3,453 | $1,385 | Not Implemented |
UA0199 # 01 Y:2018 | 01 | 2018 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $10,877 | $13,552 | Implemented |
UA0199 # 04 Y:2018 | 04 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,814 | $5,948 | Not Implemented |
CO0733 # 06 Y:2016 | 06 | 2016 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $2,200 | $9,200 | n/a |
CO0733 # 05 Y:2016 | 05 | 2016 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,200 | $500 | n/a |
CO0733 # 04 Y:2016 | 04 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,970 | $34,800 | n/a |
CO0733 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,360 | $5,950 | n/a |
CO0733 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $450 | $750 | n/a |
CO0733 # 01 Y:2016 | 01 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,020 | $1,730 | n/a |
BS0023 # 01 Y:2013 | 01 | 2013 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,128 | $10 | Implemented |
BS0023 # 05 Y:2013 | 05 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $49 | $161 | Implemented |
BS0023 # 04 Y:2013 | 04 | 2013 | INSTALL OCCUPANCY SENSORS | $983 | $2,950 | Implemented |
BS0023 # 03 Y:2013 | 03 | 2013 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $1,293 | $61 | Not Implemented |
BS0023 # 02 Y:2013 | 02 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,676 | $986 | Implemented |