IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 3425 Saw Blades And Handsaws
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0662 # 03 Y:2024 03 2024 UPGRADE CONTROLS ON COMPRESSORS $8,386 $5,500 Implemented
WV0662 # 07 Y:2024 07 2024 DEVELOP A REPAIR/REPLACE POLICY $3,117 $2,250 Implemented
WV0662 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,172 $700 Implemented
WV0662 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,538 $6,417 Implemented
WV0662 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $2,490 $392 Implemented
WV0662 # 10 Y:2024 10 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,247 $750 Implemented
WV0662 # 11 Y:2024 11 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $428 $945 Implemented
WV0662 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,601 $10,521 Implemented
UA0161 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $632 $100 Implemented
UA0161 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $140 $34 Implemented
UA0161 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,411 $8,838 Implemented
UA0161 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $328 $719 Implemented
NC0401 # 01 Y:2010 01 2010 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,744 $3,600 Implemented
NC0401 # 02 Y:2010 02 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,833 $0 Implemented
NC0401 # 03 Y:2010 03 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,578 $0 Implemented
NC0401 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $1,940 $7,800 Implemented
NC0401 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $845 $200 Implemented
NC0401 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $4,947 $6,200 Implemented
NC0401 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $5,761 $3,750 Implemented
UF0372 # 11 Y:2005 11 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,054 $4,144 Implemented
UF0372 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,223 $16,223 Implemented
UF0372 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,373 $10,886 Implemented
UF0372 # 14 Y:2005 14 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,074,880 $989 Implemented
UF0372 # 12 Y:2005 12 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,916 $15,057 Implemented
UF0372 # 01 Y:2005 01 2005 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $22,802 $2,143 Implemented