IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

586

matching recommendations
Reset
SIC 3429 Hardware, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2403 # 06 Y:2024 06 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,576 $50 n/a
UC2403 # 02 Y:2024 02 2024 PAY UTILITY BILLS ON TIME $64 $0 n/a
UC2403 # 04 Y:2024 04 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,103 $428 n/a
UC2403 # 09 Y:2024 09 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $49,517 $311,208 n/a
UC2403 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,885 $0 n/a
UC2403 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,880 $1,300 n/a
UC2403 # 08 Y:2024 08 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,116 $333 n/a
UC2403 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,934 $0 n/a
UC2403 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $753 $2,612 n/a
CI0002 # 09 Y:2022 09 2022 USE PHOTOCELL CONTROLS $1,322 $1,350 n/a
CI0002 # 02 Y:2022 02 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $27,300 $24,600 n/a
CI0002 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,201 $1,800 n/a
CI0002 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,649 $30,000 n/a
CI0002 # 01 Y:2022 01 2022 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $33,479 $80,000 n/a
CI0002 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $1,717 $2,625 n/a
CI0002 # 05 Y:2022 05 2022 UPGRADE CONVEYORS $3,825 $8,040 n/a
CI0002 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,733 $2,167 n/a
CI0002 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $3,680 $0 n/a
OK1059 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $471 $0 Implemented
OK1059 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,353 $8,612 Implemented
OK1059 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $361 $1,395 Not Implemented
OK1059 # 04 Y:2022 04 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $251 $160 Not Implemented
AS0510 # 04 Y:2021 04 2021 CONTRACT A WOOD PALLET RECYCLING COMPANY $7,800 $453 Not Implemented
AS0510 # 05 Y:2021 05 2021 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $6,879 $560 Not Implemented
AS0510 # 06 Y:2021 06 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,097 $447 Not Implemented