Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsSIC | 3429 | Hardware, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0949 # 08 Y:2016 | 08 | 2016 | OPTIMIZE PLANT POWER FACTOR | $11,423 | $30,600 | Not Implemented |
OK0949 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $17,826 | $50,400 | Not Implemented |
OK0949 # 02 Y:2016 | 02 | 2016 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,613 | $3,847 | Not Implemented |
OK0949 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,319 | $5,020 | Not Implemented |
OK0949 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $720 | $1,313 | Not Implemented |
OK0949 # 05 Y:2016 | 05 | 2016 | OPERATE BOILERS ON HIGH FIRE SETTING | $10,228 | $44,000 | Not Implemented |
OK0949 # 06 Y:2016 | 06 | 2016 | COVER OPEN TANKS | $9,702 | $850 | Not Implemented |
OK0949 # 07 Y:2016 | 07 | 2016 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $74,759 | $284,084 | Not Implemented |
OK0948 # 03 Y:2016 | 03 | 2016 | USE PHOTOCELL CONTROLS | $862 | $3,870 | Not Implemented |
OK0948 # 11 Y:2016 | 11 | 2016 | OPTIMIZE PLANT POWER FACTOR | $7,251 | $25,830 | Implemented |
OK0948 # 10 Y:2016 | 10 | 2016 | USE POWER DURING OFF-PEAK PERIODS | $12,184 | $0 | Not Implemented |
OK0948 # 09 Y:2016 | 09 | 2016 | USE OPTIMUM THICKNESS INSULATION | $58 | $203 | Implemented |
OK0948 # 08 Y:2016 | 08 | 2016 | USE OPTIMUM THICKNESS INSULATION | $382 | $1,310 | Implemented |
OK0948 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,797 | $118,583 | Not Implemented |
OK0948 # 06 Y:2016 | 06 | 2016 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $27,228 | $83,600 | Implemented |
OK0948 # 05 Y:2016 | 05 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,007 | $926 | Not Implemented |
OK0948 # 04 Y:2016 | 04 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,857 | $18,014 | Not Implemented |
OK0948 # 02 Y:2016 | 02 | 2016 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,510 | $2,320 | Implemented |
OK0948 # 01 Y:2016 | 01 | 2016 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,142 | $29,000 | Not Implemented |
IP0067 # 02 Y:2016 | 02 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,092 | $5 | Not Implemented |
IP0067 # 01 Y:2016 | 01 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $996 | $0 | Implemented |
IP0067 # 03 Y:2016 | 03 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,360 | $3 | Implemented |
IP0067 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,858 | $765 | Implemented |
IP0067 # 05 Y:2016 | 05 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $35,374 | $3,150 | Implemented |
IP0067 # 06 Y:2016 | 06 | 2016 | INSTALL OCCUPANCY SENSORS | $12,719 | $2,549 | Not Implemented |