IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 343 Plumbing And Heating, Except Electric
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0270 # 02 Y:2019 02 2019 USE COMPRESSOR AIR FILTERS $737 $200 Implemented
MZ0270 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $760 $200 Implemented
MZ0270 # 07 Y:2019 07 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $19,893 $18,000 Implemented
MZ0270 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,293 $0 Implemented
MZ0270 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,149 $33,942 Implemented
IC0181 # 11 Y:2011 11 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $1,962 $4,127 Implemented
IC0181 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $91 $29 Implemented
IC0181 # 14 Y:2011 14 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $522 $0 Implemented
IC0181 # 13 Y:2011 13 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $33 $0 Implemented
IC0181 # 10 Y:2011 10 2011 REPAIR OR REPLACE STEAM TRAPS $7,948 $1,458 Implemented
IC0181 # 08 Y:2011 08 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,382 $0 Implemented
IC0181 # 07 Y:2011 07 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,521 $600 Implemented
IC0181 # 06 Y:2011 06 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $717 $2,886 Implemented
IC0181 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,391 $4,830 Implemented
IC0181 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $533 $0 Implemented
IC0181 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $19,167 $1,700 Implemented
IC0181 # 02 Y:2011 02 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $850 $402 Implemented
BD0126 # 03 Y:1999 03 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,739 $3,302 Implemented
BD0126 # 09 Y:1999 09 1999 $6,005 $1,500 Implemented
BD0126 # 08 Y:1999 08 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $8,527 $5,500 Implemented
BD0126 # 07 Y:1999 07 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $16,941 $14,000 Implemented
BD0126 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,785 $2,365 Implemented
BD0126 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,658 $1,125 Implemented
BD0126 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $25,009 $31,450 Implemented
MO0052 # 06 Y:1992 06 1992 IMPROVE LUBRICATION PRACTICES $213 $435 Implemented