Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 343 Plumbing And Heating, Except Electric
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0145 # 08 Y:2019 08 2019 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,134 $0 Not Implemented
WM0145 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,002 $3,768 Implemented
WM0145 # 06 Y:2019 06 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,032 $771 Not Implemented
WM0145 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $3,800 $1,040 Not Implemented
WM0145 # 04 Y:2019 04 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,925 $2,210 Not Implemented
WM0145 # 03 Y:2019 03 2019 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $7,173 $2,200 Not Implemented
WM0145 # 02 Y:2019 02 2019 USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING $10,866 $8,300 Not Implemented
WM0145 # 01 Y:2019 01 2019 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $29,234 $3,500 Not Implemented
WI0322 # 06 Y:1998 06 1998 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,817 $0 Not Implemented
WI0322 # 09 Y:1998 09 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $343 $740 Not Implemented
WI0322 # 08 Y:1998 08 1998 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $2,376 $0 Not Implemented
WI0322 # 07 Y:1998 07 1998 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,087 $600 Not Implemented
WI0322 # 05 Y:1998 05 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,677 $9,000 Not Implemented
WI0322 # 04 Y:1998 04 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,205 $4,500 Not Implemented
WI0322 # 03 Y:1998 03 1998 INSTALL TIMERS AND/OR THERMOSTATS $6,348 $1,000 Not Implemented
WI0322 # 02 Y:1998 02 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $11,052 $500 Not Implemented
WI0322 # 01 Y:1998 01 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $21,516 $1,000 Not Implemented
WI0008 # 01 Y:1987 01 1987 IMPROVE LUBRICATION PRACTICES $562 $0 Not Implemented
WI0008 # 07 Y:1987 07 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $695 $500 Implemented
WI0008 # 05 Y:1987 05 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,563 $5,000 Not Implemented
WI0008 # 04 Y:1987 04 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $122 $0 Implemented
WI0008 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $644 $701 Implemented
WI0008 # 02 Y:1987 02 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $269 $0 Implemented