Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 343 | Plumbing And Heating, Except Electric |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0295 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,368 | $750 | Implemented |
TN0295 # 01 Y:1986 | 01 | 1986 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $7,892 | $48,000 | Not Implemented |
TN0295 # 03 Y:1986 | 03 | 1986 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $12,728 | $2,700 | Implemented |
TN0295 # 04 Y:1986 | 04 | 1986 | INSTALL SET-BACK TIMERS | $3,137 | $0 | Implemented |
TN0295 # 05 Y:1986 | 05 | 1986 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $293 | $0 | Not Implemented |
TN0288 # 06 Y:1986 | 06 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $223 | $600 | Implemented |
TN0288 # 05 Y:1986 | 05 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $537 | $236 | Implemented |
TN0288 # 04 Y:1986 | 04 | 1986 | INSTALL SET-BACK TIMERS | $534 | $0 | Implemented |
TN0288 # 03 Y:1986 | 03 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $881 | $120 | Implemented |
TN0288 # 02 Y:1986 | 02 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,648 | $0 | Not Implemented |
TN0288 # 01 Y:1986 | 01 | 1986 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,032 | $8,712 | Not Implemented |
ST0062 # 03 Y:1986 | 03 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,555 | $0 | Not Implemented |
ST0062 # 04 Y:1986 | 04 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $716 | $0 | Not Implemented |
MA0067 # 01 Y:1986 | 01 | 1986 | AIR CONDITION ONLY SPACE NECESSARY | $262 | $0 | Implemented |
ST0062 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,642 | $0 | Implemented |
ST0062 # 01 Y:1986 | 01 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,343 | $537 | Implemented |
OK0204 # 06 Y:1986 | 06 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $7,184 | $4,000 | Implemented |
OK0204 # 05 Y:1986 | 05 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $690 | $0 | Implemented |
OK0204 # 04 Y:1986 | 04 | 1986 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $635 | $100 | Implemented |
OK0204 # 03 Y:1986 | 03 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,377 | $545 | Implemented |
OK0204 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $372 | $0 | Implemented |
OK0204 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $178 | $144 | Implemented |
MA0067 # 05 Y:1986 | 05 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,611 | $4,710 | Not Implemented |
MA0067 # 04 Y:1986 | 04 | 1986 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,076 | $7,000 | Not Implemented |
MA0067 # 03 Y:1986 | 03 | 1986 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $484 | $900 | Implemented |