Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 343 | Plumbing And Heating, Except Electric |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0008 # 02 Y:1987 | 02 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $269 | $0 | Implemented |
GT0329 # 08 Y:1987 | 08 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,803 | $7,775 | Not Implemented |
GT0329 # 07 Y:1987 | 07 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $357 | $1,282 | Implemented |
GT0329 # 06 Y:1987 | 06 | 1987 | INSULATE BARE EQUIPMENT | $1,160 | $1,500 | Not Implemented |
GT0329 # 05 Y:1987 | 05 | 1987 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $81,476 | $57,000 | Not Implemented |
GT0329 # 04 Y:1987 | 04 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $21,756 | $30,000 | Not Implemented |
GT0329 # 03 Y:1987 | 03 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $756 | $300 | Not Implemented |
GT0329 # 01 Y:1987 | 01 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,150 | $1,000 | Not Implemented |
WI0008 # 07 Y:1987 | 07 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $695 | $500 | Implemented |
WI0008 # 05 Y:1987 | 05 | 1987 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,563 | $5,000 | Not Implemented |
WI0008 # 04 Y:1987 | 04 | 1987 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $122 | $0 | Implemented |
WI0008 # 03 Y:1987 | 03 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $644 | $701 | Implemented |
WI0008 # 01 Y:1987 | 01 | 1987 | IMPROVE LUBRICATION PRACTICES | $562 | $0 | Not Implemented |
GT0329 # 02 Y:1987 | 02 | 1987 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $5,456 | $1,000 | Not Implemented |
MA0087 # 03 Y:1987 | 03 | 1987 | INSTALL SET-BACK TIMERS | $927 | $100 | Not Implemented |
MA0087 # 09 Y:1987 | 09 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,536 | $1,350 | Implemented |
MA0087 # 08 Y:1987 | 08 | 1987 | AIR CONDITION ONLY SPACE NECESSARY | $20,849 | $1,360 | Not Implemented |
MA0087 # 07 Y:1987 | 07 | 1987 | OPTIMIZE PLANT POWER FACTOR | $864 | $3,200 | Not Implemented |
MA0087 # 06 Y:1987 | 06 | 1987 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,589 | $2,249 | Not Implemented |
MA0087 # 05 Y:1987 | 05 | 1987 | INSTALL STORM WINDOWS AND DOORS | $1,272 | $3,530 | Not Implemented |
MA0087 # 04 Y:1987 | 04 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,245 | $4,500 | Not Implemented |
MA0087 # 02 Y:1987 | 02 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,475 | $247 | Not Implemented |
MA0087 # 01 Y:1987 | 01 | 1987 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $92,624 | $210,000 | Not Implemented |
OK0216 # 01 Y:1987 | 01 | 1987 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $8,049 | $1,300 | Not Implemented |
OK0216 # 02 Y:1987 | 02 | 1987 | INSTALL TIMERS AND/OR THERMOSTATS | $4,180 | $2,250 | Implemented |