Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
55
matching recommendationsSIC | 3431 | Metal Sanitary Ware |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0116 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,073 | $12,258 | Implemented |
TT0116 # 01 Y:2013 | 01 | 2013 | OPTIMIZE PLANT POWER FACTOR | $1,609 | $5,920 | Not Implemented |
TT0116 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,077 | $700 | Not Implemented |
TT0116 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $837 | $763 | Not Implemented |
WV0428 # 09 Y:2011 | 09 | 2011 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,253 | $2,000 | Implemented |
WV0428 # 18 Y:2011 | 18 | 2011 | INSTALL OCCUPANCY SENSORS | $391 | $770 | Not Implemented |
WV0428 # 17 Y:2011 | 17 | 2011 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $860 | $0 | Not Implemented |
WV0428 # 16 Y:2011 | 16 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,125 | $3,000 | Not Implemented |
WV0428 # 15 Y:2011 | 15 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,154 | $25 | Implemented |
WV0428 # 14 Y:2011 | 14 | 2011 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,082 | $600 | Implemented |
WV0428 # 13 Y:2011 | 13 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,404 | $0 | Not Implemented |
WV0428 # 11 Y:2011 | 11 | 2011 | INSULATE BARE EQUIPMENT | $5,623 | $1,890 | Not Implemented |
WV0428 # 10 Y:2011 | 10 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,120 | $700 | Implemented |
WV0428 # 07 Y:2011 | 07 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,107 | $9,060 | Not Implemented |
WV0428 # 02 Y:2011 | 02 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,746 | $80,800 | Not Implemented |
WV0428 # 12 Y:2011 | 12 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,254 | $3,010 | Not Implemented |
WV0428 # 06 Y:2011 | 06 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,763 | $1,000 | Implemented |
WV0428 # 05 Y:2011 | 05 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $11,317 | $815 | Implemented |
WV0428 # 01 Y:2011 | 01 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $74,991 | $209,000 | Not Implemented |
WV0428 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,236 | $60,550 | Implemented |
WV0428 # 08 Y:2011 | 08 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,061 | $8,550 | Not Implemented |
WV0428 # 04 Y:2011 | 04 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,157 | $24,000 | Not Implemented |
IC0181 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $91 | $29 | Implemented |
IC0181 # 10 Y:2011 | 10 | 2011 | REPAIR OR REPLACE STEAM TRAPS | $7,948 | $1,458 | Implemented |
IC0181 # 11 Y:2011 | 11 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,962 | $4,127 | Implemented |